<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />1051.
<br />
<br />5, Surface Area of Existing Reservoir
<br />
<br />5,680 acres
<br />
<br />D. Description of Enlarged Structure:
<br />
<br />I. Location of Darn (same as existing darn):
<br />
<br />A point at the intersection of Pueblo Dam Axis and the Arkansas River whence the
<br />Northeast comer of Section 36, Township 20 South, Range 66 West of the 6th P .M"
<br />bears North 61021' 20" East a distance of2,511.05 feet. Said reservoir
<br />enlargement will inundate all or portion. ofSe:ctions 7, 18, 19,20,21,22. 25, 26.
<br />27,28,29,30,31,32,33,34,35, and 36, Tovmship 20 South, Range 66 West of
<br />the 6th P.M., Sections 1,2,3,4,5,9,10 and II, Township 21 South, Range 66
<br />West of the 6th P,M., and Sections 5, 8, 9, 13, 14, IS, 16,22,23,24, and 25,
<br />Township 20 South, Range 67 West of the 6th P.M.
<br />
<br />2. Volume of Enlargement:
<br />
<br />75,000 acre-feet, conditional
<br />
<br />3, Height of Enlarged Dam:
<br />
<br />195 feet
<br />
<br />4. Surface Area of Enlarged Reservoir:
<br />
<br />Approximately 6,616 acres
<br />
<br />E. Appropriation
<br />
<br />I. Date: August 17,2000
<br />
<br />2, How appropriation was made: Following widespread public notice. Southeastern's
<br />District Board approved a Preferred Storage Options Plan Report with
<br />recommendations including implementation and construction of the Pueblo
<br />Reservoir Enlargement. Southeastern subsequently posted notice of the application
<br />at Pueblo Reservoir.
<br />
<br />3. Date put to beneficial use: N/A
<br />
<br />-3-
<br />
|