Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1050 <br /> <br />B, Name of Structure: <br /> <br />Pueblo Reservoir Enlargement <br /> <br />C, Description of Existing Structure: <br /> <br />1. Location - Legal Description: <br /> <br />A point at the intersection of Pueblo Dam Axis and the Arkansas River whence the <br />Northeast comer of Section 36, Township 20 South, Range 66 West of the 6th P,M" <br />bears North 610 21' 20" East a distance of2,511.05 feet. Said reservoir inundates <br />all or portions of Section 7, 18, 19,20; 21,22,25,26,27,78,29,30, 31, 32, 33, 34, <br />35, and 36, Township 20 South, Range 66 West of the 6th P.M" Sections L 2, 3, 4, <br />5,9, 10, and 11, Township 21 South, Range 66 West of the 6th P.M., and Sections <br />5,8,9,13,14, 15, 16,22,23,24, and 25, Township 20 South, Range 67 West of <br />the 6th P,M, <br /> <br />2. Decrees: <br /> <br />Pueblo Reservoir was decreed in Case No. B-42135, Pueblo County District Court, <br />on June 25, 1962, with an appropriation date of February 10, 1939 (Priority No. A- <br />22C). The decree was modified in Case No. 80CW6 (Water Division 2) on <br />October 23,1980 (amended to correct clerical error on Apri129, 1981), to conform <br />to the reservoir as built. The conditional portion of the water right has been <br />maintained through a series of diligence proceedings, most recently Case No, <br />95CW91 (Water Division 2). <br /> <br />3. Storage Volume of Current Capacity: <br /> <br />The current decreed and existing capacity is 357,678 acre-feet, Of the -decreed <br />amount. 74,471 acre-feet. together with the right to refill, remain conditional. <br />Southeastern's engineers have estimated that up to 7,738 acre-feet of this capacity <br />may have been lost due to silting, <br /> <br />4, Height of Dam: <br /> <br />191 feet <br /> <br />-2- <br />