Laserfiche WebLink
<br /> <br />.,. .. " <br /> <br />~o 0 717 <br /> <br />. <br /> <br />. <br /> <br />l <br /> <br />On the Savery-Pot Hook Project substantial progress has been made on the definite <br />plan report investigations. Project land classification and drainage studies are essentially <br />complete, and the Final land classification and drainage review by Regional and Denver <br />personnel has been completed. The project lands and drainage appendix is being drafted <br />at the present ti me. Plan formulation studies are essentially complete wi th the recom- <br />mended plan consisting of an enlargement of the proposed Pot Hook Reservoir and realigning <br />the Pot Hook Canal at a higher elevation. Pot Hook Canal will also be extended to replace <br />the previously planned Westside Canal Extension, The Two Bar area will be eliminated <br />from the project plan because of poor soil quality and cost of facilities. Final project water <br />supply studies ore underway. Geological investigations of the canal locations are essen- <br />tially complete, and studies are now in progress to determine the need and type of canal <br />lining. All field surveys for project features are now complete. On-farm development <br />costs and farm-size studies are continuing. The definite plan report is scheduled to be com- <br />pleted in the fall of 1970. <br /> <br />SMAll RECLAMATION PROJECTS <br /> <br />The Overland Ditch and Reservoir Company, Hotchkiss, Colorado, has submitted <br />designs and estimates for the enlargement of Overland Reservoir under a Small Project loan. <br />Review of the designs and estimates has been completed, and our suggested design changes <br />are being made by the engineer representing the company. Fish and wildlife and recrea- <br />tion evaluations by cooperating Federal and State agencies are in progress, <br /> <br />The Farmers Water Development Company, Norwood, Colorado, has submitted a <br />draft of application report to enlarge the Gurley Reservoir, Regional Office personnel plan <br />to meet with company representatives in the very near future to discuss water supply deter- <br />minations, reservoir sizing, and designs and estimates. <br /> <br /> <br />6 <br /> <br />