Laserfiche WebLink
<br /> <br />TABLE 6 <br />AUTHORIZEO NONPARTICIPATING PROJECTS IN THE STATES OF THE UPPER DIVISION OF THE COLORADO RIVER BASIN <br />(DOES NOT INCLUDE COM?LETEO PROJECTS) <br /> <br />Project State <br /> <br />Brantley NM <br /> <br />C.rlsb.d NM <br />Colorado-Big Thompson Project <br />Horsetooth Dam CO <br />Colorado River Basin ~~linity <br />Projects, Title II J <br />Crystal Geysers Unit ur <br /> <br />Grand Valley Unit CO <br /> <br />Paradox Valley Unit CO <br /> <br />Price-San Rafael River Unit ur <br />Lower Gunnison River Basin Unit CO <br />Glenwood-Dotsero Springs Unit CO <br />Meeker Dome Unit CO <br />Oi rty Devil River Unit ur <br /> <br />Corps of Engineers <br />Flood Control Projects <br />Al.mogordo NM <br /> <br />Boulder CO <br /> <br />Buffalo Diversion Channel WY <br /> <br />Sheet I of 3 <br /> <br /> Federa 1 Cost.s <br /> (In Thousands of Dollars) <br /> Total <br /> federal Requtred <br />Author; zi n9 Obligation After FY 184 <br />LeQislation 11 11 Status and Remarks <br />96-375 162,919 97,092 Under construction. <br />92-514 <br />81-335 9,480 3,495 Inactive project. <br />95-578 3,686 3,686 Inactive project. Project to be funded after FY 1984. <br />93-320 1,169 1,169 Deauthorized unit (P.L. 9B-569) <br />93-320 243,970 203,764 Under construction. <br />$9,112,000 to be repaid by Upper Basin power revenues. l! <br />93-320 86,942 74,018 Under construction. <br /> $3,281,000 (Incl. OM&R) to bj/ep.id by <br /> Upper Basin power revenues. _ <br />93-320 7,876 7,876 Act ive project. <br />98-569 6,950 6,400 Active project. <br />93-320 Inactive project. <br />93-320 lnactive project. <br />93-320 7,500 7,500 Active project. <br />1962 Flood 11,200 1/ 11,2001/ Active project. Advance engineering and design in <br />Contra 1 Act progress. <br />1950 Flood 5,020 ~ 4 ,877 ~ Inactive project. <br />Control Act <br />1950 FlOOd 820 2! 820 2! Inactive project. <br />Control Act <br /> <br />11 From USSR Cost and Repayment Statements as of September 30, 1984 (Oct. 1985 price level). <br />21 In addition to units shown, $4,171,000 (incl. OM&R) of Las Vegas Wash Unit, Nevada to be repaid by upper basin power re~enues. <br />]V From Table 14 - Summary of Selected Data - Authorized Salinity Control Projects - Colorado River Batin, 21th Annual Report, FY 1983, Colorado River <br />Storage Project and Participating Projects. <br />41 From Telecom with COE Albuquerque District (1984 price level). <br />~I From Telecom with COE Om.h. Division (1975 price level). <br />!I From telecom with COE Om.h. Division (1950 price level). <br /> <br />29 <br />