My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05932
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05932
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:33 PM
Creation date
10/12/2006 1:22:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
8/1/1985
Author
USDOE/WAPA
Title
Report to the Congress on Colorado River Storage Project Power Resources and the Financial Support of Authorized Projects in the Upper Colorado River Basin States
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> TABLE 5 <br /> Sheet 3 of 3 <br /> AUTHORIZEO PARTICIPATING PROJECTS OF THE COLORADO RIVER STORAGE PROJECT <br /> Estimated Costs (In Thousands of Dollars) <br /> Total Additional Assistance <br /> Construction Construction Funds Required For Irrigation <br /> Authorizing Cost Expenditures After FY 1985 in FY 1985 <br /> Project State Leqislation II to Date II PRS Study Status and Remarks <br />La Barge WY 84-485 5,403 222 5,181 5,317 Inactive project. Indefinite <br /> schedul e. Schedul ed so as not to <br /> affect power rate. <br />Lyman UT, WY 84-485 32,907 32,907 0 24,026 Completed project. <br />Navajo Indian Irrigation NM 87-483 526,650 232,128 294,522 0 Under construction. Non- <br /> reimbursable Indian project. <br /> Does not require power revenues. <br />Paonia CO 84-485 8,174 8,174 0 5,196 Completed project. <br />San Juan - Chama CO, NM 87-483 115,104 75,009 40,095 62,494 Under construction. Construction <br /> essentially complete. <br />San Hi gue 1 CO 90-537 128,314 3,806 124,508 89,680 Project inactive. Indefinite <br /> schedule. Project to be funded <br /> after FY 1985. <br />Savery-- Pot Hook C.O, ,10' 84-485 137,338 2,430 134,908 128,291 Project inactive. Indefinite <br /> 88-568 (CO-63,967) s-chedule. Project to be funded <br /> (WY-64,324) after FY 1984e <br />Seedskadee WY 84-485 25,759 25,759 0 1,228 Completed project. Considered in <br /> current rate and repayment <br /> studiese Power revenues pay <br /> irrigation sunk costs. <br />Silt CO 84-485 7,450 7,450 0 5,742 Completed projecte <br />Smith Furk CO 84-485 4,586 4,586 0 3,199 Camp 1 eted project. <br />West Divide CO 90-537 273,156 2,920 270,236 180,132 Project inactivee Indefinite <br /> schedule Project to be funded <br /> after FY 1984. <br /> <br />11 From USSR Cost and Repayment Statements as of September 30, 1984 (Octe 1985 price level). Basin Fund Reimbursable Costs excluding Interest during Construction and <br />Section 8 Costse <br /> <br />28 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.