My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05932
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05932
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:33 PM
Creation date
10/12/2006 1:22:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
8/1/1985
Author
USDOE/WAPA
Title
Report to the Congress on Colorado River Storage Project Power Resources and the Financial Support of Authorized Projects in the Upper Colorado River Basin States
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> TABLE 5 <br /> S~eet 1 of 3 <br /> AUTHORIZEO PARTICIPATING PROJECTS OF THE COLORADO RIVER STORAGE PROJECT <br /> Estimated Costs (In T~ousands of Oollars) <br /> Total Additional ftss;stance <br /> Construction Construction Funds Requi red For Irrigation <br /> Aut~ori zi"9 Cost Expenditures After FY 1984 in FY 1985 <br />Project State Legis laU on 1/ to Oate 1/ PRS Study Status and Remarks <br />Animas - La Plata CO, NM 90-537 589,428 5,082 584,346 388,549 Active project, construction funds <br /> not appropriated. <br />Bostwick Park. CO 88-568 9,36011 9,,122 238 5,483 Completed project.. Some repa; rs <br /> on-g010g. <br />Central Utah Project <br />Bonneville Unit UT 84-485 1,874,352 482,300 1,392,052 843,047 Under construction. OPR <br /> 92-370 supplement nearing completion. <br />Starvation & Strawberry 480,170 :y 379,457 :y 100,713 :y <br />Collection System UT Under construction. Construction <br /> mostly completed. <br />M&I Water System 491,236 :y 65,605 :y 425,631 :y <br />(i ncl. JordanelIe) UT Under construction. <br />Diamond Fork Power 444,300 :y 18,799 :y 425,501 :y <br />_.~!_~~~----- -- UT Under construction. Const ruct f on <br /> f~n~s__ ~~~~~~_~,~~!_d,. <br />Irrigation & Drainage 458,646 :y 18,439 :y 440,207 11 Under construction. Final <br />System UT environmental statement to <br /> be filed in FY 1985. <br />Jensen Uni t UT 84-485 80,323 55,833 24.490 7.263 Under construction. Constructfon <br /> 92-370 mostly c01\llleted. <br /> <br />11 From USBR cost and repayment statements. as of September 30. 1984 (Oct; 1985 price level). <br />1r1 Basin Fund excluding Interest during Construction and Section 8 Costs. <br />"'1! Estimated breakdown of Central Utah Project. Bonneville Unit. total. <br /> <br />26 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.