My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05932
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05932
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:33 PM
Creation date
10/12/2006 1:22:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
8/1/1985
Author
USDOE/WAPA
Title
Report to the Congress on Colorado River Storage Project Power Resources and the Financial Support of Authorized Projects in the Upper Colorado River Basin States
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />V. AUTHORIZED PROJECTS <br /> <br />Western has identified 53 authorized projects in the Upper Basin States, as <br />shown on Tables 5 and 6, of which 20 are Participating Projects. There are <br />actually 71 separable features within these 53 projects, and 27 of the <br />71 features are related to participating projects. Estimated costs of these <br />projects that are presently unfunded total $2,910,714,000, which includes <br />$1,453,124,000 (50%) related to Participating Projects. <br /> <br />A total of 10 projects or separable features costing $132,899,000 have <br />been constructed. Twenty-six (26) projects or separable features are <br />under construction with a total estimated cost of $4,546,642,000 of which <br />$1,931,089,000 have been expended. The following table summarizes the funding <br />status of the authorized projects as of September 30, 1984: <br /> <br /> Funded Unfunded Total <br />Participating Projects <br />and all Other Projects <br />Receiving Assistance <br />from CRSP $3,329,549,000 $1,453,124,000 $4,782,673,000 <br />Nonparticipating Projects $1,350,192,000 $1,457,490,000 $2,807,682,000 <br />TOTAL $4,665,135,000 $2,910,614,000 $7,575,749,000 <br /> <br />The participating projects' reimbursable costs are identified in the Table 7 <br />schedule of Estimated Capital Costs and Repayment. Table 7 summarizes the <br />Statements of Project Construction Cost and Repayment prepared by the Bureau <br />of Reclamation for the various projects. <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.