Laserfiche WebLink
<br />TABLE 1 <br />LONG TERM POWER OFFERED <br />(Current and Preceding CRSP General Power Marketing Criteria) <br /> <br /> <br /> Sumner (MW) Wi nter 01W) <br />Federa 1 Project Priority Uses 55.0 6.0 <br />Northern Division <br />Long-Term Power with Energy 921.0 957.0 <br />Long-Term Peaking Power <br />Without Energy 83.2 268.3 <br />Subtotal-Northern Division 1,004.2 1,225.3 <br />Southern Division <br />Long-Term Power with Energy 240.0 84.0 <br />Long-Term Peaking Power <br />Without Energy 24.8 8.7 <br />Subtotal-Southern Division 264.8 92.7 <br />Total 1,324.0 1,324.0 <br /> <br />13 <br />