Laserfiche WebLink
<br />17:;7 <br />in Fort Morgan on September H-12, 1964. At that meeting, the <br />reco~mended Narrows site was officially approved by the Board as <br /> <br />the desired site, <br /> <br />. <br /> <br />The Board requested that further studies of the Narrovs Dam <br /> <br />and Reservoir be expedited. However, Publi,c Law' 88-41+2, approved <br /> <br />August 14, 1964, deauthorized all units of the Missouri River Basin <br />Project on which construct.ion had not been initiated. It became <br /> <br />necessary, therefore, to reorient the studies toward the preparation <br /> <br />of a feasibility planning report for reauthorization of t!le Unit by <br />the Congress of the United States. <br /> <br />Q <br /> <br />L <br /> <br />" <br /> <br />2h <br /> <br />GPO 830.456 <br />