Laserfiche WebLink
<br />17JG <br />'ltJ1uj kwtt tk. 'U1Ut ~ J,IIiIt 4HHef. ? <br /> <br />The need for a large storage and flood control structure at <br /> <br />or near the Narrovs site has been recognized locally for more than <br /> <br />50 years. <br /> <br />Folloving early investigations by private interests, by the <br /> <br />Corps of Engineers, and by the Bureau of Reclamation, the Narrovs <br /> <br />Dam and Reservoir was authorized as a unit of the comprehensive <br /> <br />Missouri River Basin Project by the flood control acts of 1946 and <br />1950. Preconstruction acti7ities vere initiated in 1947, and a <br />Definite Plan Report vas prepared by the Bureau of Reclamation in <br />1951. Public hearings in 1951, however, indicated considerable <br />opposition to the plan, principally by the residents located in <br /> <br />the reservoir area. As a result of the lack of official support <br /> <br />by the State of Colorado, all activities on the dam and reservoir <br /> <br />vere terminated. <br /> <br />During the intervening years, many discussions and meetings <br /> <br />of interested groups vere held, a steering committee was organized, <br /> <br />and the Colorado Water Conservation Board advanced funds to the <br /> <br />Bureau of Reclamation for the resumption of studies. The Bureau <br /> <br />vas specifically requested to make a hydrologic study and cost <br /> <br />comparison of an upstream site in Weld County. These studies <br /> <br />terminated in a meeting of the Colorado Water Conservation Board <br /> <br />23 <br />