My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05878
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:18 PM
Creation date
10/12/2006 1:20:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
6/1/1993
Title
Progress Reports - Elkhead Feasibility Study - June 1993 through May 1994
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />01fl-rt'B~ 9 <br /> <br />Hydrosphere' <br />Yampa River Basin Detailed Feasibility Study <br />Budget Tracking Form <br /> <br />Study Task Study Task Study Task Current Previous Charges Budget <br />Number Name Budget Charges Charges to Date Expended <br /> Project Management $18,000.00 $1,763.83 $2,579'.12 $4,342.95 24% <br /> and Administration <br />2 Negat i at i on $12,200.00 $0.00 $0.00 $0.00 0% <br /> Support <br />3 Data Acquisition $26,500.00 $8,892.27 $7.00 $8,899.27 34% <br /> and Review <br />4 Dam and Reservoir $76,940.00 $19,518.62 $258.19 $19,776.81 26% <br /> Investigations <br />5 Dam and Reservoir $52,420.00 $0.00 $0.00 $0.00 0% <br /> Engineering <br />6 Reservoir Operations $65,000.00 $4,980.72 $4,428.30 $9,409.02 14% <br /> Studies <br />7 PreLiminary Environ- $41,800.00 $2,243.39 $0.00 $2,243.39 5% <br /> mentaL Assessment <br />8 Preliminary BiologicaL $28,400.00 $0.00 $0.00 $0.00 0% <br /> Assessment <br />9 DeveLopment Plan $12,405.00 $0.00 $0.00 $0.00 0% <br />10 Report Preparation $29,100.00 $0.00 $0.00 $0.00 0% <br />11 Diversion Structure $40,430.00 $0.00 $0.00 $0.00 0% <br /> Evaluation <br /> TotaL $403,195.00 $37,398.83 $7,272.61 $44,671.44 11% <br /> <br />NOTES: '-One half of budgeted amounts for Tasks 1 and 2 are contingent on FY '94 funding. <br />2-Tasks Sf 9, 10, and 11 are contingent on FY '94 funding. <br />3-All budgets include estimated expenses. <br />4-IlCurrent chargesll include retainage at 10%. of first 50% of project cost. <br /> <br />;;jj,,<".i:t: <br />
The URL can be used to link to this page
Your browser does not support the video tag.