<br />MEMORANDUM <br /> <br />DIR \ <br />SC <br />i <br />ASC , <br />-, <br />F I <br />I , <br />L I <br />E I <br /> <br />OD0328 <br /> <br />TO: Ray Tenney <br />FROM: Chuck Brendecke <br />SUBJECT: Progress Report for July - Elkhead Feasibility Study <br />DATE: August 6, 1993 <br /> <br /> <br />, <br />Our July work included efforts directed at Tasks 3,4,6 and 7. c,~, <br />/ <br />Charges to Task 3 include professional services related to the aerial photography and '; <br />mapping at the reservoir site. The ITS invoice included all of Phase I (photography and <br />ground control). ITS has informed me that the mapping will be completed by mid-August so I <br />expect the rest of their charges will show up on our next invoice. <br /> <br />Charges to Task 4 reflect the geotechnical and geophysical work done in June and July <br />at the dam site. Our invoice includes fees related to the geotechnical exploration plan and <br />supervision (Woodward-Clyde), the geophysical tests (Davenport-Hadley, partial), and <br />miscellaneous labor by Muller Engineering. At this point it appears the geotechnical and <br />geophysical field work is complete; we expect the reports to be available by the end of August. <br /> <br />Charges to Task 6reflect ongoing work on operations studies. A TSG meeting devoted <br />to this was held on Iuly 7; at this meeting theresults of preliminary model runs were reviewed <br />and additional model runs were specitied. We will be reviewing the results' of these new runs <br />at the August 18th TSG meeting in Glenwood. <br /> <br />Charges to Task 7 reflect initial tield work at the Elkhead site by our terrestrial <br />ecologist, Warren Keammerer. I have not spoken with Warren since he visited the site, though <br />I fully expect he would have contacted me had he found anything unexpected. I will provide a <br />synopsis of his investigations at the August 18th meeting. . <br /> <br />I anticipate that by the end of August we will have the mapping and geotechnical reports <br />in hand to proceed with preliminary. design work. We should also be close to having final <br />definition of the new environmental baseline and contemplated draft. <br /> <br />Please feel free to call if you have any questions or comments on our July work effort. <br /> <br />cc: Bob Norman <br />Frank Akers <br />Bill Stanton <br /> <br />Hydrosphere Resource Consultants 1002 Walnut Suite 200 Boulder, Colorado 80302 <br /> <br />O:\PROJECTS\'~l\OOI'PllaOAE~~\U"TITlEO CIl,MEa: "''JOU:>16. IS~3 10:S:' ~M P.lINTEO: ""9Ull S. '~9J 11:0~ AM <br /> <br />~ "'"' <br />