My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05878
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:18 PM
Creation date
10/12/2006 1:20:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
6/1/1993
Title
Progress Reports - Elkhead Feasibility Study - June 1993 through May 1994
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />; <br /> <br />10-Jan-94 <br /> <br />Hydrosphere ( <br />Vamps River Basin Detailed Feasibility Study <br />Budget Tracking Form <br /> <br />Study Task Study Task Study Task Current Previous Charges Budget <br />Number Name Budget Charges Charges to Date Expended <br /> Project Management, $18,000.00 $683.35 $8,378.37 ' $9,061.72 50% <br /> and Administration <br />2 Negotiation $12,200.00 $0.00 $0.00 $0.00 0% <br /> Support <br />3 Data Acquisition $26.500.00 $836.05 $18,164.99 . $19,001.04 72% <br /> and Review <br />4 Dam and Reservoir $76.940.00 $12,185.35 $53,527.49 $65,712.84 85% <br /> Investigations <br />5 Dam and Reservoir $52,420.00 $0.00 $0.00 $0.00 0% <br /> Engineering <br />6 Reservoir Operations $65,000.00 $4,653.01 $33,621.00 $38,274.01 59% <br /> Studies <br />7 Preliminary EnvironR $41,800.00 $0.00 $2,243.46 $2,243.46 5% <br /> mental Assessment <br />8 Preliminary Biological $28.400.00 $0.00 $262.04 $262.04 1% <br /> Assessment <br />9 Development Plan $12.405.00 $0.00 $0.00 $0.00 0% <br />10 Report Preparation $29,100.00 $0.00 $0.00 $0.00 0% <br />11 Diversion Structure $40,430.00 $3,226.57 $1,095.41 $4,321.98 11% <br /> Evaluation <br /> TotaL $403,195.00 $21,584.33 $117.292.76 $138,877.09 34% <br /> <br />NOTES: 1-0ne half of budgeted amounts for Tasks 1 and 2 are contingent on FY '94 funding. <br />2-Tasks 5, 9, 10, and 11 are contingent on FY '94 funding. <br />3~All budgets include estimated expenses. <br />4-IICurrent charges" include retainage at 10% of first 50% of project cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.