My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05832
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05832
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:20:06 PM
Creation date
10/12/2006 1:18:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1989
Author
CRBSCF
Title
1988 Annual Progress Report - Water Quality Standards for Salinity - Colorado River System - January 1989
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Dolores project (Reclamation-Department of Agriculture) <br />Advance planning for the salinity control features continued <br />during 1988. Coordination with USDA representatives on the <br /> <br />salinity control features was accomplished. Reclamation's <br />o <br />~ supplemental draft EIS for the project is currently under <br />~ <br />01 review by Reclamation, filing of a final EIS is scheduled for <br /> <br />January 1989. <br /> <br />Lower Gunnison Basin Unit (Reclamation) - The advanced <br /> <br />planning on the winter water portion of this unit continued <br />during the period covered by this report and will be <br /> <br />completed in FY 1989. <br /> <br />Water Quality Improvement Program Units (Reclamation- <br />Department of Agriculture) - The following Water Quality <br />Improvement Program (WQIP) studies were continued in this <br /> <br />repor ting per iod. <br />Uinta Basin (Reclamation-Department of Agriculture) - <br />Coordination between Reclamation and the USDA has continued. <br /> <br />USDA is focusing upon onfarm improvements but has <br /> <br />strengthened coordination in the planning of its canal and <br /> <br />lateral group projects as part of the Central Utah Project <br /> <br />and Reclamation's salinity project. A preliminary Findings <br /> <br />Report, by Reclamation, on Phase II is scheduled for <br /> <br />completion in 1989. <br /> <br />USDA implementation emphasizes the use of salinity <br /> <br />control/water management plans in conjunction with cost <br /> <br />sharing from the ACP and CRSC programs. Through 1988, ASCS <br /> <br />-11- <br /> <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.