Laserfiche WebLink
<br />00605 <br /> <br />about 100 years. A spi I Iway in an adjacent rock cut which would be <br />control led by a fuse plug wi II handle the design discharge. The <br />treatment plant Is at the relocated site established for the Harding <br />alternative. Pumping from the treatment plant is the same as the <br />Harding plan. The dam height has been modified to obtain storage <br />capacity equivalent to Strontia Springs and to provide more head for <br />gravity flow. <br /> <br />Plate 7 provides a matrix comparing the alternatives. <br /> <br />4 <br /> <br />