My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05795
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:55 PM
Creation date
10/12/2006 1:17:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.500.20
Description
Uinta Basin Unit - Colorado River Water Quality Improvement Program
State
UT
Basin
Colorado Mainstem
Date
4/25/1986
Title
Planning Report/Draft Environmental Impact Statement - Uinta Basin Unit
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~i:~; <br /> <br />Chapter I <br /> <br />Ch8pter II <br /> <br />Chapter I II <br /> <br />.t';;.\ <br />'1\" <br /> <br />Chapter IV <br /> <br />CONTENTS <br /> <br />Introduction. . . . . . . . . . . . . . . . . . <br />Locat ion . . . . . . . . . . . . . . . . . . <br />Purpose, scope, and objectives of the study. <br />Authority for the 8tudy. . . . <br />General description of the area. . . <br />Existing irrig8tion system8. . . . . <br />Related activities by other agencies <br />Relationship to other water resource develop- <br />ments. . . . . . . . . <br />Central Utah Project. . . <br />Moon Lake Project . . . . <br />Uintah Irrigation Project <br />Pariette Wetland Development Area <br />Public involvement . . . . . . <br />Need for ac t ion . . . . . . . . . <br />Colorado River Basin 8alinity. <br />Uinta Basin salt loading . . . <br />Opportunities, re80urces, and constraints <br />Potential for industrial U8e <br />Construction materials <br />Water rights . . . . . . <br />Alternatives. . . . . . . . <br />Scope of plan formulation. <br />Criteria and standards for plans <br />Plan selection criteria. <br />Plan formulation . . <br />Alternative plans. . . <br />Recommended plan. . <br />Plan concept and accomplishments <br />Project facilitie8 and measure8. <br />Canal and lateral lining. . . <br />Wildlife measures . . . . . . <br />Geology and con8truction materi818 <br /> <br />Geology . . . . . . . . . . . . <br />Con8truction materials. . . . . <br />Right8-of-way and land acquisition <br />Administration. . . . . . . . . . <br />Conditions precedent to construction <br />Relocation of property <br />E8timated costs. . . . . . <br />Construction C08t8. . . <br />Operation, maintenance, and replace- <br />ment costs. . . . <br />Development program. . <br />Financial and economic analysis. <br />C08t effectiveness. . . . . . <br />C08t allocation and repayment <br />Uncertainties. . . <br />No-action alternative <br /> <br />Page <br />----r- <br />1 <br />1 <br />2 <br />3 <br />4 <br />8 <br /> <br />9 <br />9 <br />9 <br />9 <br />9 <br />10 <br />11 <br />11 <br />13 <br />15 <br />15 <br />15 <br />16 <br />17 <br />17 <br />17 <br />18 <br />18 <br />19 <br />19 <br />19 <br />20 <br />20 <br />23 <br />23 <br />23 <br />24 <br />25 <br />25 <br />26 <br />26 <br />26 <br />26 <br /> <br />30 <br />32 <br />32 <br />32 <br />34 <br />36 <br />36 <br /> <br />OUC4l.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.