Laserfiche WebLink
<br />602(a) CASE & MODIFIED DEPLETIONS CASE - <br /> <br />This case calculates the storage required in the Upper <br />Basin reservoirs in satisfaction of section 602(a) of <br />P. L. 90-537 in a manner that will require Upper Basin <br />reservoirs to be at maximum capacity. The depletion <br />schedule used is the Modified Depletions Case schedule. <br /> <br />7r~pu/ <br />! c1 <br /> <br />3 <br />