My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05790
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:53 PM
Creation date
10/12/2006 1:17:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
1/19/1982
Author
CWRSI
Title
Colorado Water Resources Research Institute Response to Tudor Proposal
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />3 <br /> <br />to perform these tasks as such. <br />Thi s proposal may be cons idered as havi ng two phases. I n Phase A, CSU <br />performs model modification and calibration in Fort Collins with assistance' <br />of TUDOR personnel. This work will be done under a subcontract with the <br />estimated budget attached herein. This subcontract will call for specific <br />work in a specific period of time for a specific task. <br />In Phase B, CSU provides intermittent advising assistance as needed. <br />The cost of this work can be set at a "per hour" rate when actually used. <br />With the model properly modified and calibrated and with TUDOR personnel <br />trained in its use, the amount of Phase B assistance ought to be minimal <br />and within CSU limitations on staff time flexibility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.