Laserfiche WebLink
<br />'<j'i <br />c,o <br />~ RESERVOIR CAPACITI~S <br /> <br />~~ <br /> <br />,,~.) Colorado shall file with the Commission a table of areas"and <br />~~) capacities for each reservoir in the Rio Grande Basin above Lobatos <br />constructed after 1937; New Mexico shall file with the Commission a <br />table of areas and capacities for each reservoir in the Rio Grapde <br />Basin bet~~en Lobatos and San Marcial constructed after 1929; ~d <br />Texas shall file with the Commission tables of areas and oapacities <br />for Elephant Butte Reservoir and for sll other reservoirs actually <br />available for the storage of water between ~lephant Butte and the <br />first diversion to lands under the Rio Grande Project. <br /> <br />Whenever it shall appear that any table of areas and capacities <br />is in error by more than five per cent, the Commission shall use its <br />best efforts to have a re-survey made and a corrected table of areas <br />and capacities to be substituted as soon as practicable. To the end <br />that the records of flow or the Rio Grande at San Marcial, at San <br />Aoacie, and below ~lephant Butte Reservoir may be correlated, the <br />Ccmunission shall use its best efforts to have the rate of accumula- <br />tion and the place of deposition of silt in Elephant Butte Reservoir <br />checked at least every three years. <br /> <br />EVAPORATION LOSS~S <br /> <br />The Commission shall encourage the equipping, maintenance and <br />operation, in cooperation with the United States Weather Bureau or <br />other appropriate agency, of evaporation stations at Elephant Butte <br />Reservoir and at or near each major reservoir in the Rio Grande Basin <br />within Colorado constructed after 1937 and in New Mexico constructed <br />after 1929. The net loss by eveporation from a reservoir surface <br />shall be taken as the difference between the actual evaporation lOBS <br />and the evapo-transpiration losses which wuuld have occurred naturally, <br />prior to the construction of such reservoir. Changes 1n evapo-transpi- <br />ration losses along stream channels below reservoirs mey be disregarded. <br /> <br />ADJUSThlENTS OF RECORDS <br /> <br />The Ca.rumission shall keep a record of the location and desoription <br />of each ~aging station and evaporation station, and, in the event ot <br />change in location of any stream gaging station for any reason, it shall <br />ascertain the increment in flow or decrease in flow between such locations <br />for all stages. Wherever practioab1e, concurrent records shall be obtain~ <br />ed for one year before abandonment of the previous station. <br /> <br />NEW OR INCREASED DEPLE TIONS <br /> <br />In the event any works are construoted which alter or may be expeot- <br />ed to alter the flow at any of the Index Gaging Stations mentioned in the <br />Compact, or which may otherwise necessitate adjustments in the appli- <br />cation of the schedules set forth in the Compact, it shall be the duty <br />of the Commissioner specifically concerned to file with the Commission <br />ell available information pertaining thereto, and appropriate adjustments <br />shall be made in accordance with the terms of the Compact, provided, how- <br />ever. that any such adjustments shall in no way increase the burden im- <br />posed upon Colorado or New Mexico under the schedules of deliveries <br />established by the Compact. <br />