My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05760
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:46 PM
Creation date
10/12/2006 1:15:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1974
Author
Unknown
Title
Fifteenth Annual Report - July 1 1974 through June 30 1975
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />to monitor the activities of that body. Pete Barrows, State of Colorado, <br />and team leader for that work item will furnish the subcommittee with a <br />preliminary status report at our next scheduled work session in September <br />(tentatively set for September 1975). We expect to have a final draft of <br />that status report together with proposed work items which might be needed <br />as fol10wup or to fill gaps ready for presentation to PSIAC at the <br />December me~ting in Las Vegas. <br /> <br /> <br />Work Item 2; Clarence Maesner, SCS, Portland, and chairman of our task <br />force for t~is wo!~ item, is going ahead with the compilation of the data <br />he received. from member States and Federal agencies concerning their pro- <br />cedures forireview and preparation of environmental assessments. A pre- <br />liminary dr~ft expected for review by the subcommittee at our September <br />work sessioj1 and final draft: should be ready for PSIAC by December meeting. <br /> <br />Work Item 3. George Hebber" BOR, San Francisco, received comments on <br />his final draft report on State-Federal coordination in recreation planning <br />at our June! meeting in Eugene, Oregon. Members not attending will send <br />comments to George by mail, and the report will be finalized and sent to <br />the Executiye Subcommittee for review and approval by August 1, 1975. Upon <br />receiving PpIAC comments, ie will be ready for publication. Some fo11owup <br />on the subject has been recommended for the subcommittee's future work <br />schedule. <br /> <br />Work Items Jor FY 1976. The Subcommittee proposes nine action items <br />during the coming year; three are expected to be finished by December or <br />before. <br /> <br />Mr. George W. Webber, Deputy Regional Director, Bureau of Outdoor <br />Recreation, San Francisco, California, was elected chairman for FY 1976. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.