My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05743
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05743
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:42 PM
Creation date
10/12/2006 1:15:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.700
Description
Fryingpan-Arkansas Project - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
5
Date
11/1/1981
Author
US DoI BoR
Title
Annual Operating Plan Fryingpan-Arkansas Project Colorado 1981 - 1982
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />" ,:' l~ .... <br />iJ.\.. <br />September 22 when the river call was renoved from the river. 'Ibtal <br />releases in acre-feet were: <br /> <br />Colorado State Departrrent of Highways <br />Colorado River Water Conservation <br />District <br />Battlanent M::!sa, Inc. <br />Exxon Company, USA <br /> <br />- 1,170.33 <br /> <br />262.74 <br />140.06 <br />12.96 <br /> <br />'Ibtal 1,586.09 <br /> <br />On September 3D, 1981, outflow fron Ruedi Reservoir was 77 ft3/s, and <br />the content was 98,490 acre-feet (elevation 7762.06). <br /> <br />Table 1 and Exhibit 2 srow the operations of Ruedi Reservoir during <br />water year 1981. <br /> <br />B. Western Slope Collection System <br /> <br />. <br /> <br />The Fryingpan-Arkansas Project irrg:orts began on April 27 and ended on <br />July 22. The Granite Creek diversion operations, first began in 1981. <br />The total West Slope diversion in water year 1981, as neasured at Charles <br />H. Boustead Tunnel outlet by the Colorado Division of Water Resources, <br />was 34,680 acre-feet (Table 2). This aIrount was close to our April 1 <br />forecast. The low volume of water was due to a snaIl Sl1CM supply with <br />low, late winter and early spring precipitation. <br /> <br />The fOllowing are the minimum bypass requirements used during the 1981 <br />operation: <br /> <br />Diversion Point <br /> <br />Minimum Bypass <br />Requirement <br /> <br />(ft3/s) <br />12 <br />6 <br />3 <br />o <br />o <br />3 <br />1 <br />1 <br />o <br />2 <br />12 <br />5 <br />4 <br />2 <br />1 <br />o <br /> <br />Fryingpan River <br />South Fork <br />Chapran Gulch <br />Sawyer Lake Creek <br />Lily Pad Creek <br />Ivanl'Pe Creek <br />Middle CUnningham Creek <br />North CUnningham Creek <br />South CUnningham Creek <br />M::mron Creek <br />Hunter Creek <br />Midway Creek <br />No Name Creek <br />Carter Creek <br />North Fork Creek <br />Granite Creek <br /> <br />. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.