Laserfiche WebLink
<br /> <br />..',.' ,~-. <br /> <br />.~-\i,~;~~\~.. <br />" ~,- ,;;'~,::. <br />'j -:'..l~" <br /> <br />.,....: <br />'~.." . <br /> <br />'..'... <br /> <br /> <br /> <br /> <br />;;~:~;;; <br /> <br />:';"" <br /> <br />~:,~~.;'> <br /> <br />.,...>:: <br />'," <br /> <br />;~; <br /> <br />::) <br />:;';;:'~ <br /> <br />(.:'" <br /> <br />.' <br />~.' <br />,'-, <br /> <br />., <br />,~ <br />J <br /> <br />" <br /> <br />" <br /> <br /><~{~~;' <br /> <br />OOlJ094 <br /> <br />...."., <br />;., "r.~ ",'~ <br />. :"',-'}" <br />.;, <br /> <br />9-04. Commissions, River Authorities, Compacts, and Committees. <br />The Arkansas River Compact Commission is responaible for monitor- <br />ing the flows on the Arkansss River to insure compliance with the <br />Arkansas River Compact. <br /> <br />9-05. Reports. <br /> <br />a. Morning Report. The <br />24-hour period and provide dats <br />reservoir during flood periods. <br />quired: <br /> <br />morning report will cover s <br />pertaining to the operation of the <br />The following information is re- <br /> <br />(l) Pool elevstion and storsge, computed inflow, and <br />outflow at 8:00 a.m., l2:00 noon, 4:00 p.m., and 12:00 midnight. <br /> <br />(2) Precipitation snd evaporation at the dam. <br />precipitation at reporting stations in or adjacent to the <br />basin. <br /> <br />Also, <br />drsinage <br /> <br />(3) Stream stages at reporting stations upstream and <br />downstream from the dam. <br /> <br />(4) Time of gste changes and the discharges. <br /> <br />(5) Other; i.e., reports of flood damage. <br /> <br />< <br /> <br />. :1 <br /> <br />b. Monthlv Charts (end-of-month summary). The Flood <br />Plain Management and Hydraulics Eranch, in accordance with EM <br />1110-2-3600 and ER 1110-2-240, shall prepare a monthly reservoir <br />regulation chart or table from information furnished by the Dam <br />Superintendent or Project Mansger. The chart is a graphical record <br />of reservoir operation during the month. Supplemental information <br />on the operation of the reservoir, such S8 an explsnation of devi- <br />ation from the approved schedule, is added as a note on the chart <br />or as an attachment. The monthly chart is submitted to Southwest- <br />ern Division not later than the l5th of the month following the <br />month of preparation. The following information is required to <br />prepare the monthly chart (end-of-month 8ummary) and covers a <br />daily period, midnight to midnight: <br /> <br />(1) Pool elevation and atorage. <br /> <br />(2) The average inflow and outflow in c.f.s. <br /> <br />(3) Precipitation and evaporation. <br /> <br />9-4 <br /> <br />'.' ." <br /> <br />..: /'., ~ -;; <br /> <br />:':,,:~:,).":.~\>~:""" ,.,. ,~ ", <br />:,; ",~...::~,,::..~:::,~;.. .-,..' .'- .; <br /> <br />..- ....' <br /> <br />. " ,~. <br /> <br />;\~.;~:;{~!:~,t'::.:".. ':,~":, . <br /> <br />, '::'-"~':'.~., <br /> <br />'," '.-,'.'. .',...,..,', <br />"':".-." "',:. "'~' " ,':, <br /> <br />',' ".'~~' <br /> <br />,1':' <br />