Laserfiche WebLink
<br />"'::'.~'. :'~'-'." .' <br /> <br />.. ...' <br />c. <br /> <br />.'. <br /> <br />;,' :': ,~.~~; ~~~:?}i{::,~( . <br /> <br /> <br />, , , .'-:;?;~:~~~i~~~X:;~i;~';~~';: :. ~. <br /> <br /> <br />000091 <br /> <br />,,~.-', . <br /> <br /> <br />" <br /> <br />IX - WATER CONTROL MANAGEMENT <br /> <br />..., .. <br /> <br />::' <br /> <br />9-01. Responsibilities and OrRanization. <br /> <br />a. Corps of Engineers. Pueblo Dam and Reservoir is <br />owned and operated by the Bureau of Reclamation. The Albuquerque <br />District, Corps of Engineers, is responsible for monitoring flood <br />control operation when in the flood control pool through the <br />Project Manager, Fryingpan-Arkansss Project. A chart, "Organization <br />for Flood Control Regulation," is shown on Plate 9-1. Project <br />flood control opersting instructions are presented in Chapter VII <br />of this manual. <br /> <br />t, <br /> <br />" <br /> <br />".,,' <br /> <br />(1) Responsibilities and Duties During Non-Flood Periods. <br />Operate in accordance with the Operating Principles. <br /> <br />(2) Responsibilities and Duties DurinR Flood Periods. <br />The Flood Plain Management and Hydraulics Branch, Albuquerque Dis- <br />trict. 1s responsible for the fol1owingt <br /> <br />"'::.',;':,..' <br /> <br />(a) Evaluation of current hydrologic and meteorologic <br /> <br />data. <br /> <br />(b) Presentation of storm and flood analysis to the <br />District Engineer and others. <br /> <br />;,. ,~ <br /> <br />(c) Monitor flood control operation. <br /> <br />. "~. '. . " <br /> <br />(d) Furnish information to higher headquarters. <br /> <br />1. Initial reports to Southwestern Division and the <br />"Office of the Chief of Engineers by telephone. <br /> <br />,.' <br /> <br />, 1. Situstion reports by teletype. The details of the <br />overall procedures under emergency conditions sre set forth in Annex <br />"A." E~gency Flood Control Activities, to ER 500-1-1 (Part I). <br /> <br />. , . ~. '" <br /> <br />(e) Upon request assist Project Manager with flood con- <br />trol operations in the conservation pool. <br /> <br />.' , <br /> <br />(3) Provision for 24-Hour Alert. The National Weather <br />Service and project personnel are provided with a list of names <br />and telephone numbers of key personnel of the Albuquerque District <br />with instructions to provide warning in the event of unusual conditions <br />at any time. Responsible personnel shsll be on duty or on call at <br />all times during flood emergencies. <br /> <br />,..,' <br /> <br />',' <br /> <br />......' <br />'.":..... <br /> <br />9-l <br />