|
<br />
<br />I
<br />I:
<br />
<br />\/,;,..'
<br />
<br />", "
<br />'...,',
<br />
<br />:'i:/:::,:;,-:
<br />
<br />...:,.' - "~,;
<br />
<br />".:-.,:
<br />," ,~..
<br />
<br />.... .,.",.
<br />
<br />,'.. ,.
<br />
<br />.'-,"'-'"
<br />/':~ ::~ "
<br />:-"::' .~.
<br />. .
<br />
<br />.,'...;.....'
<br />'.,.,','
<br />
<br />, ~:<,'~:
<br />:,:;/~,.,'
<br />:~~<~~;~-::
<br />
<br />..',::;.
<br />
<br />~~.t~~
<br />"- '..,'
<br />:.'-~>Y
<br />.,"",'.'
<br />~'>:-;'r~:~
<br />
<br />,'-'.', ,
<br />
<br />,,',' .
<br />. ~\""';
<br />
<br />-:";\-,':;
<br />
<br />,.:.'...'
<br />
<br />.-<>:.:
<br />'. -,
<br />
<br />.-
<br />,-; -"
<br />
<br />'...,
<br />
<br />".~
<br />..
<br />
<br />000083
<br />
<br />'-"~';o:.:"',
<br />.~,
<br />
<br />'~
<br />
<br />7-08. Fish anu Wildlife.
<br />
<br />a. Fish anu wildlife enhancement is an authorized project
<br />purpoAe. tlanar,ement of th~ UAh and wildlife resources of the
<br />project is the r~Aponsi~ility of the Colorado Division of Wild-
<br />life. When the planned combination warm-water hatchery and
<br />cold-water rearing unit is conAtructed below the dam, the hatchery
<br />will provide most of the fingel."lings for stocking th" reservoirs
<br />and lakes Within the Fryingpan - Arkansas Project.
<br />
<br />b. Constraints. None.
<br />
<br />7-09. Water Supply.
<br />
<br />a. The Bureau of Reclamation and the Colorado State
<br />Engineer are responsible for coordination and accounting of the
<br />conservation storage. Municipal, industrial, and irrigation
<br />water will be supplied on demand consistent with water Ownership
<br />from conservation storage. The Colorado State Engineer and the
<br />Southeastern Colorado Water Conservancy Uistrict are responsible
<br />for delivery of the water after leaving the reservoir. The Pueblo
<br />JJam and Reservoir also provides "winter water" storage for native
<br />flow during the winter months, November through March, wh'ich accumu-
<br />lates to the credit of the canal companies between Pueblo anu
<br />John Hartin Uams.
<br />
<br />b.
<br />t1ArkallHIlR
<br />Colo [ado.
<br />
<br />Cl1n~traintA. Operations mUAt confono with the
<br />laver Compact" Rnd tho wllter lawH of thl! Stat" uf
<br />
<br />7-10. Hydroelectric Po,",er. None.
<br />
<br />7-11. Other. Sediment studies indicate that approximately
<br />103,100 acre-feet of sediment will accumulate in the reservoir
<br />during a'lOO-year pe~iod. Periodic resurvey will be made to
<br />compute the volume and distribution of the sediment. No schedule
<br />exists or is planned for sediment control.
<br />
<br />7-l2. Deviation from ~lormal Flood Control Rer,ulation. There may arise oe-
<br />d. from the Hater control plan. Require-
<br />casions when it is necessary to eVlate
<br />ments for temporary modification of the Water Control Plan are presented in
<br />Exhibit B, paragraphs d (9); (vi), (vii) and (viii). These paragraphs are
<br />
<br />quoted here for ready ~efe~ence:
<br />
<br />(vi) The wllter contrul plan is subject tu tempurary
<br />rl~~uttnl\ hy thu C\lrpH of 1':n..,.l1\u~r1i. if fU\l1h\ IUWUtltiury
<br />
<br />-....
<br />
<br />t;
<br />
<br />I-I,
<br />
<br />::::;t~:Yf~r~>
<br />
<br />,'7",:.>/~, }.,~'" '.
<br />. ,
<br />
<br />. v.'
<br />
<br />.\:>':'..:': f ~.-:" " J',.,
<br />. . r" ,'....;. '..'.. ,/
<br />
<br />, ":':~:,,:'7i?~~>" : ::~>>.' ~ . ~:
<br />
<br />. "~:,
<br />
<br />.~..,,:;_' ,."1::.
<br />.'.....:.,,;..'1".,
<br />
<br />,':',.
<br />
<br />~" '. '.,', -'.'
<br />
|