Laserfiche WebLink
<br />:~-;,i:::"~ ; ,. F' <br /> <br />... -.' ~ <br /> <br /> <br />" '. .', _-:~", : :'~:::~:~.~:J.,~~?:~L, :~.,~::" <br /> <br />'.-,', :,~ ~;~~>'~;.'.~~/~;;~.~~'~::;~. . ", <br /> <br /> <br />".{:,::r:;:: ::.:~~~;::';~..;~:~.'~::\:~;::\,:;:~(~.:: ' :~ <br /> <br />, . . -,.. ":",~'~:,::::.~:: ":,,, <br /> <br />00008{) <br /> <br />'" <br /> <br /><:'~'., <br /> <br /> <br />,-,.,', . <br /> <br />VII - WAtER CONTROL PLAN', I <br /> <br />. :~'. :'. ' <br />. , <br /> <br />7-01. General Objectives. The primary objectives of the Pueblo <br />Dam end Reservoir are to provide flood control, municipal and <br />industrial water, irrigation water. recreation, end fish and wild- <br />life enhancement. <br /> <br />7-02. Major Constraints. Channel capacity below the Pueblo <br />Floodway and Levee Extension is 5,000 c.f.s. while the outlet <br />works (spillway and river) can make controlled releases from <br />5,000, at bottom of conservation pool, to 9,300 c.f.s. The <br />66,000 acre-feet of storage batween elevetions 4880.6 and 4893.8 <br />feet mal (initial conditions) is joint-use storage and will be <br />used exclusively for flood control from 15 April to 31 October. <br />The Pueblo Oam and Ressrvoir ~ill be operated to conform with the <br />"Arkansas River COlllpact," .ee Section IX of Mastar Manual, and <br />Colorado State Laws. <br /> <br />7-03. Oversll Plan for Water Control. The flood control <br />storage space will be operated in a manner to obtain maximum <br />benefits downstream. The remaining storage capacity will be <br />operated to conform with the criteria end limitations of the <br />Fryingpan - Arkansas Project. The specific objectives <br />and regulations procedures for the various project purposes are <br />discussed in the following paragraphs. <br /> <br />7-04. Standinr, Instructions to Dam Superintendent. The Operating Principles <br />dictate project operation for purposes other than flood control. Flood con- <br />trol Operation is set forth generally in Exhibit Il, Flood Control Regulations, <br />and specifically in Exhibit E, Water Control Diagram. Exhibit F is Standing <br />Instructions to Dam Superintendent. <br /> <br />7-05. Flood Control. <br /> <br />a. Normal Regulation for Flood Control. The Pueblo <br />Dam and Reservoir will be regulated for optimum flood reduction <br />on the Arkansas River from the dam to the John Martin Dam and <br /> <br />,,::-,.!,:' <br />,'<. ....'. <br /> <br />?,:';}-. <br /> <br />7-1 <br /> <br />,.' <br /> <br />,....,:", <br />.' <br />,.,;: <br /> <br />',,", <br /> <br />h,'. <br /> <br />'\'" . <br /> <br />;.~ .; <br /> <br />:,:,""'., <br /> <br />., <br /> <br />. .'1,'. <br />"... , <br /> <br />.. <br />-i;. <br />:,',:':::\~~';~l' <br />;:';".;-'::~..., <br /> <br />'...-;0.. <br />,"-f' <br /> <br />...., , <br /> <br />'~', <br /> <br />" " ,. <br /> <br />..',>i: <br /> <br />.. ,~ <br /> <br />... ,", <br />..' ,~ <br /> <br />.,.:" <br /> <br />