Laserfiche WebLink
<br />,...". <br /> <br />,.' . <br /> <br />.,...... <br />" ,',' <br /> <br />..:,{: <br />." ....f::;'.;~ <br /> <br />~Y;r( // <br /> <br />. . .. ~ ,.,~.:. ' <br />.,;.'. -".. .. <br /> <br />-..,...... <br />, ~.:.:':: ~ ~~.~). :: <br /> <br />.-,~.;<".<~:~ <br /> <br />, ~'.:;:- ,..: <br /> <br />.'.,,'.:- <br /> <br />. .' , <br />.' ,.". .;~' ;;.: <br /> <br /><~~~;;)i:'~ <br />." :<. <br />:..~::\.,~;. <br /> <br />'-....... ': <br />.';';.,' <br />'.., " ._. <br /> <br />::'''/:. ';,~;: <br /> <br />.';,.' <br /> <br />..;;..,..}'./: <br />..:..:i....\:: <br /> <br />'. ., <br /> <br />',',' <br /> <br />: ,'.'i;.: <br /> <br />~-\t')' <br /> <br />'. .. <br />',";' <br /> <br />" , <br /> <br />': '. <br /> <br />,. <br /> <br />',',' <br /> <br />"'.' ..' <br /> <br />"'",', <br /> <br />'. ,.::.:~'t::~.\~.{,:<:;..~:.,.'., <br /> <br />OJJJ13 <br /> <br />7-08. Fish and Wildlife. <br /> <br />a. Fish and wildlife enhancement is an authorized project <br />purpose. Hanagement of the fish and wildlife resources of the <br />project is the responsibility of the Colorado Division of Wild- <br />life. When the planned combination warm-water hatchery and <br />cold-water rearing unit is constructed below the dam, the hatchery <br />will provide most of the fingerlings for stocking the reservoirs <br />and lakes within the Fryingpan - Arkansas Project. <br /> <br />b. Constraints. None. <br /> <br />7-09. Water Supply. <br /> <br />a. The Bureau of Reclamation and the Colorado State <br />Engineer are responsible for coordination and accounting of the <br />conservation storage. Municipal, industrial, and irrigation <br />water will be supplied on demand consistent with water ownership <br />from conservation storage. The Colorado State Engineer and the <br />Southeastern Colorado Water Conservancy District are responsible <br />for delivery of the water after leaving the reservoir. The Pueblo <br />!Jam and Reservoir also provides "winter water" storage for native <br />flow during the winter months, November through March, which accumu- <br />lates to the credit of the canal companies between Pueblo and <br />John ~~rtin Dams. <br /> <br />b.. Constraints. Operations must conform with the <br />"Arkansas River Compact" and the water laws of the State'" of <br />Colorado. <br /> <br />7-10. Hydroelectric Power. None. <br /> <br />7-11. Other. Sediment studies indicate ~~at approximately <br />103,100 acre-feet of sediment will accumulate in the reservoir <br />during a 100-year period. Periodic resurvey will be made to <br />compute the volume and distribution of the sediment. No schedule <br />exists or is planned for sediment control. <br /> <br />7-12. Deviation from Normal Flood Control Regulation. There are <br />occasions when it is necessary or desirable to deviate from the <br />water control plan for short periods of time. The Part 208.11 <br />Regulations which apply to deviations or modifications are pre- <br />sented in paragraphs d(9)(vi) tilrough d(9)(viii) of the regulation. <br />These paragraphs are quoted below for ready reference: <br /> <br />(vi) The water control plan is subject to temporary modi- <br />fication by the Corps of Engineers, if found necessary <br /> <br />7-4 <br /> <br />. :J.: .;', :';:~ <br />'.".;;./ <br /> <br />, ,..- <br />~, <br /> <br />"',. <br />~<': ." <br />. ,c, <br />~"\p' <br /> <br />Rev. 26 Oct 1978 <br /> <br />", ...., <br /> <br />..'..):~~;?;~X::f. . <br /> <br />....... ". <br /> <br />.:>.:'/::>:-:'~ <br />. ... ....,.:. <br /> <br />..' <br /> <br />:-. :.., ~. <br /> <br />....j....:,'::'),.-':,... <br />_. ,_ "',:V <br />