My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05705
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:33 PM
Creation date
10/12/2006 1:12:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
Statewide
Date
3/11/1964
Author
CWCB
Title
Engineering and Geologic Investigation and Analysis of Alternate Proposed Dam Sites on the South Platte River - Morgan and Weld Counties-Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0'0"'"1"0:;'" <br />VLiVJ <br /> <br />---- - ---_.- - <br />'r---------- <br /> <br />-2- <br /> <br />.-' <br /> <br />I <br />,;1 determining the correct location of the axis for this dam, thL'se <br /> <br />.' <br /> <br />.."~' <br /> <br /> I <br /> :1 <br /> ,; <br /> " <br />fi' <br />;;-- <br />"' <br />~:'-ll' <br /> I <br /> <br /> : <br /> II <br /> , <br />'l" <br /> " <br /><"I 'I <br />.~ I <br /> <br />consultants were instructed to confine their study to the relative <br /> <br />engineering geologic conditions and earth embankment design cri- <br /> <br />ttria at the sites involved or to those things on which geologic <br /> <br />or soil factors might have some degree of influence. <br /> <br />It was <br /> <br />, <br />'I <br />" <br /> <br />pointed out that studies performed by the U. S. Bureau of <br /> <br />'I <br /> <br />Reclamation and others had indicated that each site area had cer- <br /> <br />tain advantages over the other and as a result, the geologic and <br /> <br />soil conditions might eventually be the deciding factor in the <br /> <br />final site selection. <br /> <br />A summary of our basic conclusions is given below. <br /> <br />SUMMARY <br /> <br />(1) Seepage analysis of the proposed lower Weld County site in- <br />dicates an expected loss of 31 cubic, feet per second with no <br />cutoff beneath the dam as compared to 40 cubic feet per sec- <br />ond at the Narrows site with a 5,000-foot upstream blanket. <br />The upper Weld County site offers the possibility of an es- <br />sentially complete cutoff of reservoir seepage and of the <br />South Platte underflow, if desired. Such an opportunity docs <br />not exist at the Narrows site. <br /> <br />I, <br />, <br /> <br />(2) Impervious materials are available within 7 miles for the <br />lower Weld County site, and within 1 mile at the Narrows site. <br />The cost of overhaul for the Weld site will depend on the de- <br />sign volume of the impervious section and could be minimized <br />by constructing a thin ,impervious core. <br /> <br />(3) <br /> <br />Comparative estimates of construction costs for Narrows as <br />compared to Weld County should be made, using the data ob- <br />tained in these investigations. <br /> <br />\ (4) <br /> <br />It is our general opinion, from the engineering and geologic <br />viewpoint, that the Weld site is superior to the Narrows site. <br /> <br />INVESTIGATION DATA <br /> <br />The following data from prior investigations was made avail- <br /> <br />able to the writers by the U. S. Bureau of Reclamation, The <br /> <br />'I <br /> <br />Riverside Irrigation District, and others. <br /> <br />, <br />I <br />:1 <br /> <br />10 <br /> <br />U. S. G. S. topographic quadrangle sheets with all <br />
The URL can be used to link to this page
Your browser does not support the video tag.