Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />POWER PRODUCTION AND MARKETING <br /> <br />Entimated erergy delivarab1e to load centers from powerp1~nts <br />CCl1orado Ri\"er Storage projeot and Cent:.:'!!!. Utab project <br />(~nit--l,OOO,OOO ki1o~~tt-bours2-- <br />ColOI'adCl River <br />St.orage project Central Total <br />Fiscal Cbn-'Fla'iiiIng cure:- Utah Non- <br />yea~ CRnG"Cn Gorge canti project Firm firm Total <br />1965 2,1335 315 1,500 1,65:) 3,150 <br />1966 3,082 268 2,950 400 3, 350 <br />1967 3,450 300 3,200 550 3,750 <br />1968 3,952 293 3,750 500 4,250 <br />1969 4,049 401 3,950 500 4,450 <br />1970 4,079 480 241 4,250 550 4,800 <br />1971 4,066 540 294 4,250 650 4,900 <br />Avg. 1972-81 5,303 529 782 236 5,700 1,150 6,850 <br />Avg. 1982-91 4,534 402 804 360 5,550 550 6,100 <br />Avg. 1992-2001 ,,412 360 718 360 4,850 0 4,850 <br />Avg. 2002-11 4,825 497 866 Y362 5,1,00 1,150 6,550 <br />Avg. 20l;~::'7 4,397 449 792 362 5,200 80:) 6,000 <br />After 20 2 3,674 388 776 362 ~850 350 5,200 <br />~ ~ual amounts of energy from tbe Central Utah project are <br />assumed to remain constant after 2001. <br />2/ For tbe Colorado River Storage proJeot, tbe ennual amounts <br />of energy after 2021 are assumed to be oonstant and equal to tbe <br />20-year average obtained by continuing tbe stu1y from the year 2022 <br />through 2041. <br /> <br />23 <br />