My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05692
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP05692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:28 PM
Creation date
10/12/2006 1:11:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.100
Description
Section D General Studies - Power
State
CO
Basin
Statewide
Date
4/6/1976
Author
Unknown
Title
Socio-Economic Impact of Energy Development in Western Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001621: <br /> <br />SUI~I\V\RY OF FRONT END FUNDING COH:'iITTEE ACTIVITES <br /> <br />Committee predicts deficiencies in funding in the following areas: <br /> <br />SCHOOL DISTRICT: <br /> <br />School district will be $200,000 short of funds in 1975 due to 200 <br />students over capacity. Further needs (attached sheet) include: <br />Construction of a new 1,000 student high school, remodeling and <br />additions to the present elementary and middle schools. <br /> <br />CITY OF CRAI G: <br /> <br />City needs $2,111,655 over the next three yeas. <br />1976 Hater Storage Tanks $370,000,00 <br />1976 Installation of water mains and <br />drilling of well to supplement <br />existing "later supply <br />Additional <br />1977 Construction of a City Hall, <br />Installation of a pump station <br />1978 Addition to the library <br /> <br />$215,000.00 <br />$662,000.00 <br /> <br />$615,000,00 <br />$150,000.OD <br /> <br />City <br />1976 <br />1977 <br />1978 <br /> <br />estimates to have available <br />$ 330,000.00 <br />350,000,00 <br />360,000.00 <br />$1,040,000.00 <br /> <br />for these projects: <br /> <br />HOSPITAL: <br /> <br />1975 Shortfall in operating expenditures ($72,000) and bui1din9 <br />remodeling construction costs. $160,000 <br /> <br />1976 14 bed addition, remodeling of service a,eas and central <br />supply area. $1,428,000 <br /> <br />1977 New outpatient buildin9 and Doctors building <br />$572 ,250. <br /> <br />1980 Enlal~ge patient are~s, O.B. and therapy areas <br />$645,000 <br /> <br />$2,805,250.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.