My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05692
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP05692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:28 PM
Creation date
10/12/2006 1:11:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.100
Description
Section D General Studies - Power
State
CO
Basin
Statewide
Date
4/6/1976
Author
Unknown
Title
Socio-Economic Impact of Energy Development in Western Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OOlo2~ <br /> <br />CRt.lG (cont.) <br /> <br />I-lATER 2, SE!IER SYSTEf-IS: <br /> <br />The city owns and maintains the entire water system and that portion <br />of the sewer system excepting the west Craig sanitation district. <br /> <br />Hate)" Tap Fees <br />Se,-,er Tap Fees <br />Service Charge 1-1onthly Rate-\>:ater <br />Ser'lice Charge I-lonthly Rate-Se\,er <br /> <br />= $250,00 <br />= $250.00 <br />= $ 4.00 <br />= $ 2.00 <br /> <br />Craig will receive in 1975 a $250,000.00 Title IX Water Supply Loan <br />and $175,000,00 Title IX Storm Sewer Loan. Craig has placed a <br />moratorium on the extension of water service outside the city until <br />their capacity can be increased, <br /> <br />HOUSING: <br /> <br />(197.5) Figures) <br />Total Available Units <br />For P,ent <br />For Sale <br />r':obi 1 e Homes <br /> <br />= 1,200 <br />= 0 <br />= 15 <br />~ 250 <br /> <br />Craig will receive in 1975 a $750,000,00 loan from FmHA for a <br />40 unit housing project. <br /> <br />HEALTH CARE: <br /> <br />Craig has a hcspital \-/ith a 30 bed capacity, There ai"e four doctors <br />in to"ln, <br /> <br />GOIJER;'I,'-!UITAL AiiD P~~,i-I;Ili!G CAPABILITIES: <br /> <br />Craig does not have a full-time city manager, engineer, or planner. <br />They have a comprehensive plan completed in 1974, as well as, buildin9 <br />CO~2S, a zoning ordinance and subdivision regulations, <br />
The URL can be used to link to this page
Your browser does not support the video tag.