Laserfiche WebLink
<br /> <br />. - <br />_.w",'. <br /> <br />LU; \ L <br /> <br />"" <br /> <br />Dam, as a result of the change in the point of diversion of Colorado <br />River water for San Diego from a point immediately above Im~ <br />perial D::lrn to the District intake above Parker Dam. It was found <br />necessary to protf'ct the Unit(>(1 Stales from loss of energy at Parker <br />power plant attributablt> to the change in the point of diwrsion of <br />water for the San Diego area. A contract was negotiah,-'d in which <br />the District agreed to pTo\-ide replacemt'nt energy and falling <br />water iiutlicient to kt-'t'Jl whole the power privilege of the United <br />States. This. in turn, required negotiation of a contract with the <br />Southern California Edison Company for replacement energy. All <br />of the contracts involved are contingent upon annexation to the <br />District of the San Diego County Water Authority. At the dol'll' <br />of the fil'lClll year the C"ontrncts mentioned were in the early l'Itu)(el! <br />of IlP)(otiation. <br /> <br />COlII1H'Jlnltioll iusurUllre <br />The IJjlitrict continut'd to IIl>lUrt' with the California State Coo1- <br />pen~ation Insurance Fund. This is believed to be more economicnl <br />than self.insurancl:' for the rt'latin.Jy ~mall force now l-'mploy['(!. <br /> <br /> <br />Colorado Hirer <br /> <br />