<br />'",!;.'\J '}.. <br /> <br />]0 <br /> <br />METIlOI'Ol.IT,\N KATEH )))STHlr:T <br /> <br />Colorado River water entered what is now called Lake Mathews, <br />in the coastal llasin of Southern Califol"llia. on November 2, 1939. <br />The net construction cost,of the principal main aqueduct fea- <br />tures is given in table 2, <br /> <br />TADl.r. 2 <br />MAIN AQUEDUC'i' FEATURE" <br />June :{O, 1946 <br /> <br />Prelimillary rxp",nse ....... <br />Right flf I\ar. lands, and t'asellJents..... . <br />Rl)(lds ...........u....... <br />CI,nSlfll(lill!\ \,'8Ier S)..teIU.. <br />Cc,n~lrllf-liun power system.. <br />Parker Dam <br />TlIrml"l~, ("(IIII.tete lined <br />Cllt.alld.('nn~r cOllJllit~ <br />Cllnnele linelf 1';H1HI~ . <br />Unlillt:d ('an<ll <br />Siphnn~ <br />Tt:leph'lne Iinl:" <br />Tran;:mi..si"n linl~'" ... ................. <br />Pumping plan's and camps <br />,'JbcellaJ)"'IIJ~ <br />RC~l'r\/lir.", Gt'Ilf" .IIHI Cnpper Basin.. <br /> <br />1.'l3 milt"" <br />lRO miles <br />477 1l1ilt'~ <br /> <br />Y2.0lJ mill'.... <br />:H.-1.'i mile..; <br />f12.81 mile..; <br />l.05 mile., <br />ZR53 mile" <br />,no mile.. <br />2..J0 mile!; <br /> <br />TOlal <br /> <br />NI::T <br />CONSTRUCTION <br />COST <br /> <br />S 4,632,285.07 <br />],333.510,90 <br />].057,001.45 <br />704,06J.67 <br />706,,)23.2.3 <br />i,21B,774.29' <br />68.485,348,46 <br />14,1]5,469,66 <br />7.746,71],52 <br />143,324,37 <br />9,828,207.BfJ <br />337,896.39 <br />2.715,274.03' <br />15.809,801.11 <br />1,406,.142,55 <br />1,056.548,23 <br /> <br />$136,443,719,48 <br /> <br />.. <br /> <br />'11lc1\\.le~ $t>oo.r,l)t; F"'11 (,-,11'1 Yubl,,: \\'...Iks A,I",i"'~lr.lI"'J1. <br />~lI'cl\\Jt~ $~5.J.~G[..J;- f,~r ground wires fUll1isheu by l)o::fells~ PI:lnt CorpOr:l\i"l\ ;" cnn,,"1o:r:lti"11 <br />iUT tr"II'llli~';;'.,r: S.'i "J['l' 10 l~a';Lc :M.:l.gn~~iul11 Inc. <br /> <br />P"",pillg plants <br /> <br />Deliverv of water to Lake Mathews \Vas made during pumping <br />periods of one to three weeks in each month of the fiscal year <br />~xcept July and December 1945 and March 1946. The pumping <br />schedules were arranged in so far as practicable in cooperation <br />with the Pacific Southwest Power Interchange Committee, After <br />January 1, 1946 the schedules were arranged to make available <br />to the Southern California Edison Company the maximum trans. <br />mission capacity from Boulder to Hayfield over the District sys. <br />tem under the District.Edison Transmission Contract. In April <br />1946 Copper Basin reser\'oir \\'H.:.. lov..cred to permit a detailed exam- <br />ination of Copper Basin Dam. The water released was pumped <br />through the aqueduct to Lake Mathews and the reservoil' was im. <br />mediately refilled from the Colorado River. <br />