<br />Colorado River water entered what is now called Lake Mathews,
<br />in the coastal llasin of Southern Califol"llia. on November 2, 1939.
<br />The net construction cost,of the principal main aqueduct fea-
<br />tures is given in table 2,
<br />
<br />TADl.r. 2
<br />MAIN AQUEDUC'i' FEATURE"
<br />June :{O, 1946
<br />
<br />Prelimillary rxp",nse .......
<br />Right flf I\ar. lands, and t'asellJents..... .
<br />Rl)(lds ...........u.......
<br />CI,nSlfll(lill!\ \,'8Ier S)..teIU..
<br />Cc,n~lrllf-liun power system..
<br />Parker Dam
<br />TlIrml"l~, ("(IIII.tete lined
<br />Cllt.alld.('nn~r cOllJllit~
<br />Cllnnele linelf 1';H1HI~ .
<br />Unlillt:d ('an<ll
<br />Siphnn~
<br />Tt:leph'lne Iinl:"
<br />Tran;:mi..si"n linl~'" ... .................
<br />Pumping plan's and camps
<br />,'JbcellaJ)"'IIJ~
<br />RC~l'r\/lir.", Gt'Ilf" .IIHI Cnpper Basin..
<br />
<br />1.'l3 milt""
<br />lRO miles
<br />477 1l1ilt'~
<br />
<br />Y2.0lJ mill'....
<br />:H.-1.'i mile..;
<br />f12.81 mile..;
<br />l.05 mile.,
<br />ZR53 mile"
<br />,no mile..
<br />2..J0 mile!;
<br />
<br />TOlal
<br />
<br />NI::T
<br />CONSTRUCTION
<br />COST
<br />
<br />S 4,632,285.07
<br />],333.510,90
<br />].057,001.45
<br />704,06J.67
<br />706,,)23.2.3
<br />i,21B,774.29'
<br />68.485,348,46
<br />14,1]5,469,66
<br />7.746,71],52
<br />143,324,37
<br />9,828,207.BfJ
<br />337,896.39
<br />2.715,274.03'
<br />15.809,801.11
<br />1,406,.142,55
<br />1,056.548,23
<br />
<br />$136,443,719,48
<br />
<br />..
<br />
<br />'11lc1\\.le~ $t>oo.r,l)t; F"'11 (,-,11'1 Yubl,,: \\'...Iks A,I",i"'~lr.lI"'J1.
<br />~lI'cl\\Jt~ $~5.J.~G[..J;- f,~r ground wires fUll1isheu by l)o::fells~ PI:lnt CorpOr:l\i"l\ ;" cnn,,"1o:r:lti"11
<br />iUT tr"II'llli~';;'.,r: S.'i "J['l' 10 l~a';Lc :M.:l.gn~~iul11 Inc.
<br />
<br />P"",pillg plants
<br />
<br />Deliverv of water to Lake Mathews \Vas made during pumping
<br />periods of one to three weeks in each month of the fiscal year
<br />~xcept July and December 1945 and March 1946. The pumping
<br />schedules were arranged in so far as practicable in cooperation
<br />with the Pacific Southwest Power Interchange Committee, After
<br />January 1, 1946 the schedules were arranged to make available
<br />to the Southern California Edison Company the maximum trans.
<br />mission capacity from Boulder to Hayfield over the District sys.
<br />tem under the District.Edison Transmission Contract. In April
<br />1946 Copper Basin reser\'oir \\'H.:.. lov..cred to permit a detailed exam-
<br />ination of Copper Basin Dam. The water released was pumped
<br />through the aqueduct to Lake Mathews and the reservoil' was im.
<br />mediately refilled from the Colorado River.