My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05579
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:21:15 PM
Creation date
10/12/2006 1:07:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
11/24/1948
Author
Pol Rev Com Gun-Ark
Title
Minutes of Meeting Policy and Review Committee Gunnison-Arkansas Project Colorado with attached reports and documentation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, ' <br /> <br />'''L; <br /> <br />J03S <br /> <br />(r) Fish. wildlife. and recreation. The Fish and Wildlife Service <br />report is not yet available and the Interior Field Committee has matter <br />under advisement, This matter will be expedited and coordinated with the <br />State Game and Fish Commission. <br /> <br />Mr. Gildersleeve questioned the adequacy of the appendix on Municipal and <br />Domestic Water Supply in vieW of recent actions taken by several of the <br />municipalities in the Vall.e;y. Mr. Batson informed the group that the <br />appendix would be revised bY' an addenda to cover the recent studies of the <br />Colorado Springs vater supply problem. <br /> <br />17; During the discussions of the status of revieWs'it was disclosed <br />that Mr. Powell had prepared for his own information a short. form of repOrt <br />comprising a digest of, and reflecting the latest changes in, the' present <br />preliminary draft of Regional Director I s Report and Substantiating Report. <br />The Committee was unanimously and enthusiastically agreed that such a <br />digest report would be welcomed for review. Regional Director Batson <br />agreed to make available copies of this report, together with copies of <br />the s\lllllllB.I"Y statement on economic feasibility, to members of the committee <br />and their advisors for their study in order to expedite their reviews of <br />the preliminary draft of report. <br /> <br />Assignments to the Engineering Advisory Sub-committee <br /> <br />18. As a means of expediting and coordinating the reviews of the <br />Committee on the engineering aspects of the preliminary draft of report <br />it was agreed by the Committee that the Engineering Advisory Sub-committee <br />. would review the engineering phases of (a) the revised Appendix on Power <br />Production together with the sUllllllaI"y' statement on the economic phases as <br />it affects the information on power production and other engineering <br />problems of the project, and (b) the digest form of report which the Re- <br />gional Director is having duplicated for use of the Committee and its <br />advisors, and would report its findings and recommendations to the <br />Committee. <br /> <br />Next Meeting <br /> <br />19. It was agreed to hold the next meeting of the Committee in <br />Denver, Colorado, on September 28, 1949. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.