Laserfiche WebLink
<br />Purpose <br /> <br />Flood Control <br /> <br />TABLE 4 <br /> <br />Allocation and Distribution of Interest During Construction 11 <br />(Interest on costs through June 30, 1974, at ,2-1/2% per annum simple rate) <br /> <br />Curecanti <br /> <br />$ 179,495 <br /> <br />Reservoir Fishery Enhancement <br /> <br />Irrigation and Other <br />Consumptive Uses <br /> <br />Road Relocation <br /> <br />Power <br /> <br />... <br />'" <br />Total <br /> <br />306,932 <br />18,592 <br />9,137,029 <br /> <br />$ 9,642,048 <br /> <br />Distribution <br />Flaming <br />Gorge <br /> <br />$ <br /> <br />589,547 <br /> <br />'1,310,929 <br /> <br />2,932,761 <br /> <br />$ 4,833,237 <br /> <br />Glen <br />Canyon <br /> <br />$ <br /> <br />840,269 <br /> <br />6,871,264 <br /> <br />18,816,605 <br /> <br />$ 26,528,138 <br /> <br />Navajo <br /> <br />$ 130,037 <br /> <br />479,070 <br /> <br />2,007,333 <br /> <br />'$ 2,616,440 <br /> <br />Transmission <br />Division Total <br /> <br />$ <br /> <br />$ <br /> <br />309,532 <br /> <br />1,908,886 <br /> <br />5,921,636 <br /> <br />10,496,458 <br />18,592 <br /> <br />36,808,031 <br /> <br />$ 5,921,636 $ 49,541,499 <br /> <br />11 Distribution is made on the basis of the distribution of the construction costs of each storage unit. <br /> <br />.~ <br />