My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05570
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:55 PM
Creation date
10/12/2006 1:07:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.60
Description
CRSP
Basin
Colorado Mainstem
Date
12/1/1974
Author
USDOI/BOR
Title
Report on Allocation of Costs - Colorado River Storage Projects
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Purpose <br /> <br />Flood Control <br /> <br />TABLE 4 <br /> <br />Allocation and Distribution of Interest During Construction 11 <br />(Interest on costs through June 30, 1974, at ,2-1/2% per annum simple rate) <br /> <br />Curecanti <br /> <br />$ 179,495 <br /> <br />Reservoir Fishery Enhancement <br /> <br />Irrigation and Other <br />Consumptive Uses <br /> <br />Road Relocation <br /> <br />Power <br /> <br />... <br />'" <br />Total <br /> <br />306,932 <br />18,592 <br />9,137,029 <br /> <br />$ 9,642,048 <br /> <br />Distribution <br />Flaming <br />Gorge <br /> <br />$ <br /> <br />589,547 <br /> <br />'1,310,929 <br /> <br />2,932,761 <br /> <br />$ 4,833,237 <br /> <br />Glen <br />Canyon <br /> <br />$ <br /> <br />840,269 <br /> <br />6,871,264 <br /> <br />18,816,605 <br /> <br />$ 26,528,138 <br /> <br />Navajo <br /> <br />$ 130,037 <br /> <br />479,070 <br /> <br />2,007,333 <br /> <br />'$ 2,616,440 <br /> <br />Transmission <br />Division Total <br /> <br />$ <br /> <br />$ <br /> <br />309,532 <br /> <br />1,908,886 <br /> <br />5,921,636 <br /> <br />10,496,458 <br />18,592 <br /> <br />36,808,031 <br /> <br />$ 5,921,636 $ 49,541,499 <br /> <br />11 Distribution is made on the basis of the distribution of the construction costs of each storage unit. <br /> <br />.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.