My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05551
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:50 PM
Creation date
10/12/2006 1:06:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
822.600.10
Description
Colorado River Annual Operating Plan - Annual Reports
Basin
Colorado Mainstem
Date
1/1/2002
Author
USDOI/BOR
Title
Annual Operating Plan
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br /> <br />THE SECRETARY OF" THE INTERIOR <br />WASHINGTON <br /> <br />JAN 1 4 2002 <br /> <br />Honorable Kenny Guinn <br />Governor of Nevada <br />Carson City, >Jevada 89701 <br /> <br />Dear Governor Guinn: <br /> <br />The Bureau of Reclamation. after consultation on September 26. 200 I, with representatives of <br />the Colorado River Basin States, the Upper Colorado River Commission, appropriate Federal <br />agencies. Indian tribes, and others interested in Colorado River operations. established the <br />Annua/ Operating Plan. (copy enclosed) for the Colorado River reservoirs for 2002. The plan of <br />operation reflects use of the reservoirs for all purposes consistent with the "Criteria for <br />Coordinated Long.Range Operation ofrhe Colorado River Reservoirs Pursuant to the Colorado <br />River Basin Project Act of September 30,1968" (Operating Criteria). <br /> <br />Pursuant to required Secretarial determinations. storage equalization and the avoidance of spills <br />will control the annual releases from Glen Canyon Dam in accordance with Article lI(3) of the <br />Operating Criteria unless the minimum objective release criterion in Article Il(2) is controlling. <br />lfthe equalization criterion is controlling, Glen Canyon Dam \vill be operated to rdease <br />suflicient waler during water year 2002 to equalize, as nearly as practicable, the active reservoir <br />contents of Lake Powell and Lake ~lead on September 30, 2002. <br /> <br />Taking into accounl (l) the existing water supply conditions in the basin. (2) the most probable <br />near-term water supply conditions in the basin, and (3) that the beneficial consumptive use <br />requirements of Colorado River mainstream users in the Lower Division States are expected to <br />be more than 7.5 million acre. feet (MAF) or 9.250 million cubic meters (~ICM), and specifically <br />(-t) the Interim Surplus Guidelines. the Full Domestic Surplus condition is the criterion governing <br />the operation of Lake ;...1ead for calendar year 2002 in accordance with Article 1II(3)(b) of the <br />Operuting Criteria and Article II(B)(2) of the Decree and Section 2(B)(2) of the Interim Surplus <br />Guidelines. The estimated amount of surplus water expected to be pumped or released from <br />Lake ~lead during calendar year 2002 is not expected to exceed O.6-.t.O ~lAF (789.-.t.-.t. MCM). <br />The actual amount of surplus could be less than this amount (in the likely event of the use of any <br />available unused apportionment) and could also. based on actual Direct Delivery Domestic Use. <br />exceed this projected amount. <br />
The URL can be used to link to this page
Your browser does not support the video tag.