Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />r}.-- ,- ,'" <br />", I'll: <br />.....-'... ... <br /> <br />Operation, Maintenance, and Replacement <br /> <br />The Bureau would at all times be responsible for operating <br />Narrows Dam and Reservoir and appurtenant works for the safety <br />of the structure, Since the reservoir would be operated to <br />serve collateral purposes, an Annual Operating Plan would be <br />prepared at the beginning of each operating year, The plan <br />would outline the operations for the oncoming year, based on <br />three conditions of water supply: (1) a reasonable maximum, <br />(2) a reasonable minimum, and (3) the most probable. <br />Periodically throughout the runoff season, the plan would be <br />modified as required to reflect runoff conditions. The Bureau <br />would operate the reservoir consistent with prior water rights <br />and with water rights obtained for the unit and would make <br />irrigation releases of unit water in accordance with requests <br />received from the Lower South Platte Water Conservancy District, <br />The Bureau would also operate the reservoir to accomplish the <br />flood control objectives of the Annual Operating Plan. Whenever <br />the reservoir water surface would be in the allocated flood <br />control space, the reservoir would be operated for flood control <br />purposes as directed by the Corps of Engineers. <br /> <br />Irrigation water would be released from the reservoir through <br />the river outlet works and the Fort Morgan Canal outlet works, <br />Releases to the South Platte River and the Fort Morgan Canal would <br />be measured immediately below the outlet works. <br /> <br />The estimated annual personnel requirements and associated <br />costs for the Bureau's OM&R organization, exclusive of personnel <br />in the South Platte River Projects Office, are estimated to be <br />as follows: <br /> <br />Personnel <br /> <br />Cost <br /> <br />1 - Reservoir superintendent - GS-7 <br />Standby superintendent <br />Wage board maintenance crews <br />Total <br /> <br />$7,000 <br />500 <br />1,500 <br />$9,000 <br /> <br />The estimated OM&R annual equipment requirements and costs <br />for the Bureau's organization,are: <br /> <br />38 <br />