Laserfiche WebLink
<br />oooon <br /> <br />eluding a canp at thc d<,""sito, have been cOB)leted and these features <br />can b8 mac1e read:" for ao.vertisenent to ':lid on short notice. Detailed <br />topography of tho 8ntire project covcri~G more than 250,000 acres has <br />been cor,lpl<'lted. <br /> <br />Specifications can be pro;Jared for the !:lain canal on short notice. <br />Paper location of the remaininG ca,1a1 lines has been ,lade and final <br />fielf'. locatio:1 nos been nade for sono of the lines. Detailed land <br />classification of tho project wes conpleted but considerable field <br />recheck l'as fonnd necessaI'"'J. <br /> <br />Practically no procress Has T.lade tOlJard orGanization of "the dis- <br />trict, but la:1o. ollnerships havo been dotermined and maps completed. <br />Excess land holdines havo boen appraised ai1d much study has beon given <br />to scttlerl,mt problei..:s on tho project, A detailed unit report Has in <br />drdt form and unc'8r reviel' at the end of the year. Total costs during <br />the fiscal year wero $290,126. <br /> <br />11ISSOL~I-SOL1US UNIT (Montana)(8) <br /> <br />aorrr'l.m ~)l55.00Q: Much of the activity on the Montana portion of <br />the Missouri-Souris Unit lias dirccted tOl.1Qrd tho final selection of <br />the ;assouri Rivor Diversion Dam and final location of tho main canal <br />from the diversion am" to Muddy Creok, a dist~nce of 96 nU.le3. Several <br />sites on the llissouri River have beeI"'. "urveyed and drilled and preliln- <br />inar;;. estinatos l1Bve been made to determine the mest favorable site <br />for the dan altho~[h final location has not been 0.oterMined. Consid- <br />erable stud)' uas ::ade of an alternu.te reservoir on Muddy Creek to <br />avoid inundation of large areas on that creek and tuo small tOHns. <br />No final decision 1-las roached on this study. <br /> <br />Roctifioc1 aerial photo[;raphs of the entire area in .Mont.:ma hael. <br />bee!! pruviousl:' con.~raeted and at the and of the year 39 pcrce!!t of <br />'che photographs had bOO,1 dQlivered. Total costs to the Hontana por- <br />tion of the HissrY..u"i-Sou:;,'ic Unit d'J.rinc: the fiscal year were (i154,770. <br /> <br />HOlITANA PInIPING UNIT(9) <br /> <br />Pror.ran ;)90.000: These investigations covor a s~ries of pumping <br />units alonc.. the llisso'J.ri River in H0l1t.:m8 bab'een Fort Peck Dam and the <br />oonfluo!!ee of the l'lisGouri a,ld Yollol1stono Rivers. DurinC the ).ear Hork <br />uus concentrated on the N-Ear-N Unit, detailed plans for lIhiell uere <br />brow;ht to ui thin 25 percent of COl:1plotion. . Total costs for those in- <br />vestigations during the fiscal year uere ~gO,039. <br /> <br />IlILAH UNIT(lO) <br /> <br />Pror<ran ;~25.000: This cmall unit involves construction of an <br />off-strean reservoir about t'lo ;~:iles froel the South Fork of Sun River to <br /> <br />59 <br />