My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05449
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:23 PM
Creation date
10/12/2006 1:02:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1948
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1948
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />!iAmll!iJ!~IT (4) <br /> <br />Pror,:ran ~?27 .000.: It Has the intentio:1 ot the beginning of the <br />fiscal -:rear to conplete all necessary preconstruction vlork on the <br />Yelloutail Dam, the principal feature of the Hardin Unit, during the <br />fiscal jrear. <br /> <br />The isolated location of this site required construction of a <br />100-iaan carnp to house personnel. Foundation conditions at the dam- <br />site required services of severalcianond drills throughout the year <br />and 1,L~00 linear feet of prospecting tunne13 ([3'6" x 6'6") vJere driven. <br /> <br />Preconstruction Hork ,ms pursued so energetically that funds <br />began to rlL.'1. out about midyear and activities "ere Greatly curtailed <br />durinc the lost six months of t.he year. Materials required for con-. <br />struction of tile da::l ~lere definitely located. All h~rc1ro1oGic, pOvler, <br />and geolo~'ic studi~s ilere completed. All detailed surveys at the dam- <br />site Here conpleted and designs a~d estimates were adval~ed to the point <br />~here construction sDecifications can be issued on short notice. <br /> <br />Some "lork vIas done on deter!:1ining ol/nerships for the very com- <br />plicatedlanc1 pattern on the area to "lJe directly irrigated fron the <br />dam. For this reason lone:, drawn-out and intensive negotiations lIith <br />the CroH Indians will ~Ie required before construction can be initiated. <br />Costs to June 30, 194[~ .Here ~;22, 500 in excess of the program. <br /> <br />HELENA VALLEY UNITill <br /> <br />n:~a.m Ct29.000: It Has planned to do as much "lork as possible <br />on this area 1/~,000 acr3s) Fhich Hill be served by pumping from <br />Canyon Ferry Reservoir. To bring the plans to completion, detailed <br />topocraphic map~)ing Has completed for 16,900 acres and detailed land <br />c-lassitication uas completed on 11,900 acres. Ground Hater observa- <br />tio~1s arc beinr; riade on lM~ Hells ;i.Jl the area. Costs to JW1e 30, 19M~ <br />uerc ')6,555 in oxcoss of the progrron; -. <br /> <br />JEFFERSON RIVZR UfJIT(61 <br /> <br />I <br />I <br /> <br />Pro,"':ram l~30JOOO: Host of the activities in the Jefferson River <br />Basin "Iere confined to foundation ex,loration at the Clark Canyon and <br />r~lly dronsitcs. Detailed surveys of the Clark Canyon damsite and <br />reservoir Here cor.lpletcd. Detailed topoc;ra7hy lias ta~:en on 1,100 acres. <br />of land to be served by t~is reservoir. Land classification on se- <br />lected check areas uas 80 percellt complete at the end of the year. <br />Costs Here 06,300 in e:ccess of the program. <br /> <br />LOWER MARIAS UNIT(?) <br /> <br />ftograT.1 (~308.000: Work has been in progress on this porjoct for <br />more than tHO years. Desj.C'l1 data for Tiber Da.ll and Reservoir, in- <br /> <br />sS <br />
The URL can be used to link to this page
Your browser does not support the video tag.