My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05449
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:23 PM
Creation date
10/12/2006 1:02:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1948
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1948
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />000028 <br /> <br />mission line from Fort Peck to Garrison Dam (Spec. 1411) was awarded <br />on December 6, 1946 and the contractor acknowledged notice to proceed <br />on January 30, 1947. At the start of fiscal year 1948, five months <br />later, the contract was less than one percent completed. At the close <br />of fiscal year, it was only 11 percent complete, but poles and mate- <br />rialo were becoming available in sufficient quantities that completion <br />of the contract is expected by the end of the calendar year. <br /> <br />Two transmission lines, Brush to Sterling and Sterling to Holyoke, <br />were completed in June 1948. <br /> <br />The map on the opposite page shows existing Bureau of Reclamation <br />transmission lines and also those included in the fiscal year 1948 <br />program. Also shown are the approximate locations of all REA Coopera- <br />tives to which the Bureau of Reclamation is now supplying power. <br /> <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.