My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05449
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:23 PM
Creation date
10/12/2006 1:02:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1948
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1948
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO-BIG THOMPSON PROJECT (1). <br /> <br />Horsetooth Reservoir <br /> <br />Description: Horsetooth Reservoir will be about six and one- <br />half miles long and about one-fourth to three-fourths of a mile wide. <br />The reservoir will be formed by constructing the Horsctooth Dam and <br />Sntanka Dike at the north end of the basin and by constructing the <br />Soldier Canyon, Dixon Canyon, and Spring Canyon Dams across the <br />three channels eroded through the east riIll of the basin. Physical <br />characteristics are as follows: <br /> <br />lliw1 <br /> <br />Max. Height <br /> <br />Crest Leng~ <br /> <br />Horsetooth <br />Soldier Canyon <br />Dixon Canyon <br />Spring Canyon <br /> <br />125 feet <br />205 II <br />220 " <br />205 II <br /> <br />1,600 feet <br />1,400 1\ <br />1,200 1\ <br />1,100 " <br /> <br />PrQf1:ram FY48: Work will be continued on the four dams forming <br />the reservoir. The contractor for the Horsetooth and Soldier Canyon <br />Dams has sched11lod these dams to be 71 percent complete by the end <br />. of the fiscal year. Tpe contractor for Dixon Canyon and Spring <br />Canyon Dams has estimated these dams to be 85 percent complete by the <br />end of the fiscal year. <br /> <br />'" <br /> <br />-, <br /> <br />Accomplishments FY48: Horsetooth Dam and Satanka Dike were 40 <br />percent complete with 54 percent of time elapsed. Excavation was <br />completed and 94,000 cubic yards of embankment and ll,OOO cubic yards <br />of concrete were placed. . <br /> <br />Soldier Canyon Dam was 60.4 percent complete with 67 percent of <br />time elapsed. Excavation was completed and 1,700,000 cubic yards of <br />embankment wero placed, bringing the height of the dam to 98 feet. <br /> <br />Dixon Canyon Dam was 64.4 percent complete with 66.5 percent <br />of time elapsed. Excavation was completed and 1,700,000 cubic yards <br />of embankment were placed, bringing the height of the dam to 129 <br />feet. <br /> <br />Spring Canyon Dam was 74.7 percent complete with 66.5 percent <br />of time elapsed. Excavation was completed and l,600,OOO cubic yards <br />of embankment were placed, bringing the height of the dam to 148 <br />feet. <br /> <br />'> <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.