My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05441
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:22 PM
Creation date
10/12/2006 1:01:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
6/1/1949
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1949
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />oa1j1G~; <br /> <br />Program FY49 <br /> <br />Funds available, 0211,708. <br /> <br />Construction was scheduled to <br />start on the N-Bar-N Unit. <br /> <br />Accomplishments FY49 <br /> <br />Costs to June 30, $77,537. <br /> <br />Although no construction was started, <br />the detailed report for N-Bar-N Unit <br />was completed and preparation of <br />specifications is well underway. <br /> <br />A preliminary draft of the repayment <br />contract has been prepared. <br /> <br />MOORHEAD UNIT <br /> <br />Descri'Otion: The t.ioorhead Unit is on Powder River in !<lontana. <br /> <br />In !<lontana, 42,600 acres of land, lying in the valley between the <br />Nontana-Hyoming State Line and the mouth of the river, are to be sup- <br />plied with water for irrigation by a series of pumping plants. The <br />water supply will be provided by the Noorhead Reservoir, with an ulti- <br />mate capacity of 975,000 acre-feet. <br /> <br />.. <br /> <br />Program FY49 <br /> <br />Funds available, $617,959. <br /> <br />The accnss road and Governmont <br />camp were scheduled to be com- <br />pleted and construction was to <br />start on the dam. <br /> <br />Accomplishments FY49 <br />Costs to June 30, $497,920. <br /> <br />A contract for constructing 14 pre- <br />fabricated houses was completed and <br />two other contracts for utilities <br />were in progress. <br /> <br />llo construction ~Ias started on <br />Moorhead Dam although specifica- <br />tions are being prepared. <br /> <br />SUN RIVER PROJECT <br /> <br />Descriptio~: Sun River Project is located on the Sun River, west <br />of Great Falls, Montana. The projoct is prepared to su!,ply water to <br />107 ,000 acres. Hater is diverted from the North Fork of the Sun River <br />into Pishkun Reservoir, and thence into the Sun River Slope Canal for <br />irrigation of the land. <br /> <br />Program FY49 <br /> <br />Funds available, 030,751. <br /> <br />Drainage work was to be con- <br />tinued, using Government forces. <br /> <br />Accomplishments FY49 <br /> <br />Costs to June 30, 028,138. <br /> <br />Some 1,300 feet of drain had been <br />excavated by the end of June. <br /> <br />4'3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.