My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05441
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:22 PM
Creation date
10/12/2006 1:01:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
6/1/1949
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1949
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO-BIG THOl1PSOH. PROJECT <br /> <br />Horsetooth Reservoir <br /> <br />Description: Horsetooth Reservoir with a capacity of 147,300 <br />acre-feet will be about six and one-half miles long ,and. about one- <br />fourth to three-fourths of a mile wide. The reservoir will be formed <br />by constructing the Horsetooth Dam and Satanka Dike at the north end <br />of the Basin and by constructing the Soldier Canyon, Dixon Canyon, <br />and Spring Canyon Dams across the three channels eroded' through the <br />east rim of the Basin. Physical characteristics are as follows: <br /> <br />Q.!!!!! Max. Heil!ht Crest I.e ngth <br />Horsetooth 125 feet 1,600 feet <br />Soldier Canyon 205 " 1,400 " <br />Dixon Canyon 220 " 1,200 " <br />Sprine Canyon 205 " 1,100 " <br /> <br />The Horsetooth dams will cost an estimated 012,600,000. The <br />current value of the prime contracts for these dams are as follows: <br />Horsetooth and Soldier Canyon $5,617,180 and for Dixon Canyon and <br />Spring Canyon $4,446,227. <br /> <br />A graphic representation of the work performed in this area <br />during the year is shown on the opposite page as "ell as a chart <br />of the costs for the entire Colorado-Big Thompson Project. The <br />following is a brief comparison of the fiscal year 1949 program vs. <br />accomplishments. <br /> <br />Prol!ram FY49 <br /> <br />Accomplishments FY49 <br /> <br />Construction was scheduled for <br />completion on all four of the <br />Horsetooth drons. <br /> <br />The contract for Dixon Canyon <br />and Spring Canyon dams was com- <br />pleted during March 1949. On <br />June 30 the work on Horsetooth <br />and Soldier Canyon dams "as 98 <br />percent complete. <br /> <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.