Laserfiche WebLink
<br />RIVERTON PROJECT <br /> <br />Description: Riverton Project is located in Fremont County, <br />Wyoming, on the ceded portion of the Wind River Indian Reservation <br />and west of the Big Horn River. The project receives its water supply <br />from Wind River and tributaries with the principal storage at Bull <br />Lake Reservoir and supplementary storage at Pilot Butte Reservoir. <br />Water from the natural flow in Wind River, supplemented by storage <br />water from Bull Lake Reservoir, with 152,000 acre-feet capacity, lo- <br />cated on Bull Lake Creek, a tributary of Wind River, is carried in <br />the Wyoming Canal from Wind River Diversion Dam, five miles below <br />Bull Lake D~. Here water is diverted through a drop to Pilot Butte <br />POlrer Plant, capacity 1,600 kilowatts, thence into Pilot Butte Reser- <br />voir, capacity 30,000 acre-feet. Pilot Canal takes water from this <br />reservoir to serve a part of the irrigable land and \~yoming Canal <br />extends easterly, from the point of diversion to the power plant to <br />serve the remainder of the project. <br /> <br />At the start of the fiscal year contracts were in force, as fol- <br />10.-1s: Lost Wells Lateral System (98 percent complete) and Wyoming <br />Canal (58 percent); Wyoming Canal and Drains (3 percent); North and <br />Pavillion Lateral System (17 percent). The total cost of Riverton <br />Project is estimated to be $201.538,000. The total cost to June 30, <br />1949 was $13,789,258. Of the $3,080,591 expended during fiscal year <br />1949 $1,833,621 or 60 percent was in the form of contract earnings. <br /> <br />The following is a brief comparison of the fiscal year 1949 pro- <br />gram vs. accomplishments. A graphic representation of the status of <br />work and work performed during the past year is shown on the opposite <br />page. <br /> <br />.. I <br /> <br />, Progranl FY49 <br /> <br />- --- - ---- <br />--. ,- <br />Accomplishments FY49 <br /> <br />Funds available - ~~3,168,496. <br /> <br />Costs to June 30, 1949 - $3,080,591. <br /> <br />Wyoming Canal and Laterals <br />(Sta. 883 to tunnel) and Gov- <br />ernment camp were to be com- <br />pleted. Construction has to <br />start on the Wyoming Canal <br />(1st Divn.), the Wyoming Tun- <br />nel and the canals and lat- <br />erals from Station 2560. <br /> <br />Contracts for the Hyoming Canal <br />(Sta. 883 to tunnel) and Drains <br />were completed. Construction <br />of the l1/yoming Canal and Muddy <br />Ridge Canal, including the tun- <br />nel, were 49 percent complete <br />on June 30. There were 50 farm <br />units comprising 5,912 acres <br />opened up during the year. <br /> <br />. I <br /> <br />28 <br />