My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05441
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:22 PM
Creation date
10/12/2006 1:01:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
6/1/1949
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1949
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONSTRUCTION PROGRAM <br /> <br />BUREAU OF RECLAMATION <br /> <br />There were 134 separate construction contracts in force during <br />the fiscal year and each of these required many additional supply con- <br />tracts and work by Government forces. Summarized information on these <br />construction contracts is shown by a series of tables later in this <br />report. The following table shovTs the total value of contracts a- <br />warded throughout the year, as well as major features which were placed <br />under contract each month. <br /> <br />CONTRACTS AWARDED FY1949 <br /> <br />Date <br /> <br />Value of all Constr. <br />Contracts Awarded <br /> <br />July 1948 <br /> <br />$ <br /> <br />739,749 <br /> <br />August <br /> <br />2,352,866 <br /> <br />September <br /> <br />1)063,196 <br /> <br />October <br /> <br />167,142 <br /> <br />--- NOvenioEfr------10-;-649,190 --- <br /> <br />December <br /> <br />7,337,785 <br /> <br />January 1949 <br /> <br />210,959 <br /> <br />Fe bruary <br /> <br />249,009 <br />12,657,331 <br /> <br />March <br /> <br />Hajor Features <br /> <br />Cola .-Big Thompson - Clearing part of <br />Granby Reservoir - $191,340. <br />Cedar Bluff - 20 houses at Ellis, <br />Kansas - $167,994. <br /> <br />Riverton - Construction of Wyoming and <br />Muddy Ridge Canals - $1,589,220. <br /> <br />Frenchman-Cambridge - 30 houses at <br />Trenton, Nebraska - $278,640. <br />Transmission Lines - Substation at <br />Alliance, Ne braska - $189,760. <br /> <br />Miscellaneous. <br /> <br />- ------~--.--~~------------- <br /> <br />St. Francis - Construction of Bonny <br />Dam and access road - $10,301,653. <br /> <br />Grand River - Construction of Shadehill <br />Dam - ~;,116,796. <br /> <br />Transmission Lines - Substation at <br />Watford City, No. Dak. - $108,800. <br /> <br />Miscellaneous. <br /> <br />Bostwick - Construction of Superior <br />Courtland Diversi.on Dam, - $866,263. <br />Cedar Bluff - Construction of dam and <br />county road - $11,350,735. <br /> <br />" I <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.