Laserfiche WebLink
<br />WHAT WILL HAPPEN TO THE MVI SYSTEM? <br /> <br />The MVI's diversion dam, Main Canal No. <br />2, tunnel, and 1.3 miles of the East <br />and West Laterals near the tunnel will <br />be replaced by project facilities admin- <br />istered by the Dolores Water Conservancy <br />District. Water supplies for the MVI will <br />be delivered through these project fac- <br />ilities by the District. All other MVI <br />facilities will be unchanged and will <br />remain fully under the control of the <br />MVI. <br /> <br />WILL MUNICIPAL AND INDUSTRIAL <br />WATER BRING RAPID GROWTH? <br /> <br />No. The project area will probably <br />grow at about the same rate as the long- <br />term historical average. The project <br />water supply has been designed to meet <br />this rate of growth until the year 2030, <br />or about 50 years. With full development, <br />the water supply would be-- <br /> <br />Cortez 6,200 acre-feet <br />Dove Creek 600 " <br />Towaoc 1,000 " <br />Rural areas 900 " <br />Total 8,700 acre-feet <br />