Laserfiche WebLink
<br />Seven Principal Optiqns Considered to <br />~ Control Flows and Salinities at SIB(co~t.) <br />"'-l <br /> <br />5. Moving some or all of the Yuma Vaney drainage well water <br />from SIB to NIB and diluting remaining Yuma Valley <br />drainage flow with water from the 242 Wen Field. <br /> <br />6. Move$ all of the drainage water arriving at the Yuma Valley <br />Main Drain to the NIB and uses the 242 wen Field and East <br />and West Main Canal Wasteways for the source of water <br />delivered to NIB. <br /> <br />7. Moves drainage water from the Yuma Vaney drainage <br />wens and Yuma Vaney Main Drain north to Imperial Dam <br />and de:.livers water to SIB from the 242 wen Field and any <br />remaining Yuma Vaney Main Drain flows and East and <br />West Main Canal Wasteway flows. <br /> <br />NOTE: All options reduce variability in flows from the BPP. <br /> <br />i>. <br /> <br />dlnI9000wploverhead\slbproh1.reVlstorklcfI11/0,198 <br /> <br />,~, '" ,'- <br />