Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />7. A description of what the engineer considers the major work <br /> <br />tasks which would be necessary to perform the study, <br /> <br />including the estimated elapsed time and man-weeks of effort <br /> <br />required for each, and a schedule of milestones, if <br /> <br />considered necessary. <br /> <br />8. A description of the firm's ability to write, edit, and <br /> <br />produce a report, including the production of associated <br />p"el;",,: ~ <br />graphics and design drawings. <br />"' <br /> <br />9. A work effort estimate table giving details of the man-weeks <br /> <br />to be spent on various work tasks by the different personnel <br /> <br />who would be involved in the study. <br /> <br />10. A schedule of the daily rates of the firm's personnel <br /> <br />effective for the duration of the study, together with <br /> <br />automobile and four-wheel-drive vehicle costs per mile, per <br /> <br />diem travel rates, etc. <br /> <br />11. The name of each principal and lead professional who is <br /> <br />expected to work on the study, and his academic training and <br /> <br />professional experience. Please specify who the study <br /> <br />manager would be. <br /> <br />-6- <br />