My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05396
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:10 PM
Creation date
10/12/2006 12:59:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
2/1/1963
Author
USBR
Title
Cache La Poudre Unit - Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />~ <br /> <br />find <br />$1,035,000 is <br />/l <br /> <br />- 3 - <br /> <br />Benefits <br /> <br />M. & I. (16,000 A. F. @ $26) <br />Irrigation - (11,300 A. F.) <br /> <br />Flood control <br /> <br />Fish & Wildlife <br /> <br />Recreation <br /> <br />Total Benefits <br /> <br />Benefit-Cost ratio - Initial Plan 1.58 to 1.0 <br /> <br />Cost Allocations (Estilllated for Initial Phase) <br /> <br />(See Page 93) <br /> <br />Repayment of irrigation costs <br />Missouri River Basin Fund (originally by power) <br />Total j'"r1ja/-"" <br />M. & I. (Project & interest during constr.) <br />Fish & Wildlife (Pro-ratio) <br /> <br />Recreation <br /> <br />( 11 <br /> <br />11 ) <br /> <br />$ 417,000 <br />224,700 <br />o <br /> <br />127,000 <br />128,000 <br />$ 897,200 <br /> <br />$ 1,695,000 "', <br />:3 ,522,000 f:l' <br /> <br />$ 5,197,000 <br />6,554,000 <br />2,820,000 <br />2,710,000 <br />$ 17,281,000 <br /> <br />,~ <br /> <br />30, I ?n <br /> <br />B 8'. '7. <br />I ro. Z 'lJ. 31.' <br />1:'-, 7 '1. <br /> <br />Cost of project, including interest during constr. = $18,316,000. <br />The difference between project costs and allocations / amounts to <br /> <br />subject to an adjustment by the Bureau, or will be paid frcm MRB funds. <br /> <br />Total <br /> <br />The Cammissioner of the Bureau of Reclamation specified two pre- <br /> <br />investigation requirements that must be met before feasibility investigations can be <br /> <br />under taken. They are as followSI <br />
The URL can be used to link to this page
Your browser does not support the video tag.