Laserfiche WebLink
<br />;4A-~~J <br /> <br />P~nn 3 <br />SUMMARY SHEETS (Continu~d) <br /> <br />ESTIMATED COSTS <br /> <br />Total construction coste . . . <br />Interest during construction . <br />Annual operation, maintenance, <br />costs (1968-70 prices) . . . <br /> <br />. . . . . . <br /> <br />. . . . . . <br /> <br />and rcplaccnll~nt <br /> <br />. . . . .. . . . <br /> <br />BEI\I::FIT-COST ANALYSIS (lOO-year period of analy.in) <br /> <br />Aversge annual benefits <br />Industrial, municipal. and domestic use <br />Irrigation . . . <br />Recreation .... <br />Fish and wildlife <br />Flood control . . <br />T~tal <br />Less benefits lost in reservoir basins <br />Net benefits . . . . . . . . . <br />Average annual equivalent costs (5 1/2 peI'ccnt interea t) <br />Benefit-cost ratio . . . . ; . . . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />,'- <br /> <br />, , <br /> <br />.' <br /> <br />2 <br /> <br />$1,8,825,000 <br />5,290,000 <br /> <br />760,500 <br /> <br />. . <br /> <br />$4,874,500 <br />612,900 <br />2.45,300 <br />, 131,700 <br />11,000 <br />5,B61,900 <br />9.90Q <br />5,872 ,000 <br />3,867,600 <br />1. 52 : 1 <br /> <br />" <br />