Laserfiche WebLink
<br />i["r..,):~..., <br />;~"~l' <br />I , ,.. <br /> <br />January 1973 <br /> <br />Pllln 3 <br /> <br />SUM/1ARY SHl>ETS <br /> <br />Yellow Jacket Project, Colorado <br /> <br />Plan 3 -includes the Milk Creek sevnent exactly liS presented in the Feasi- <br />bility Report of April 1972. <br /> <br />,Two res,ervoirs, are included in Plim 3. The Lost Park Reservoir on lost <br />"Creek located and sized as presented in the Feasibility Report and the <br />'Po"ell Park Reservoir on the White River below the toml of Meeker. <br /> <br />Releases from the Lost Park Reservoir would be lifted .about 300 feet by <br />a pump near the Lace Avery location to t.he Yellow Jacket Canal to serve <br />municipal and industrial water needs in the Coal Creek vicinity /lnd <br />irrigation water in the little Beaver aren. Fishery flows would be <br />maintained below ,both reserwirs and pump lift. <br /> <br />Municipal and,induatria1 water requirements in the Piceance Creek Ilasin <br />would be met by pumping out of the Powell Park Reservoir. <br />, I' <br />WATER SUPPLY (average acre-feet annually) <br /> <br />Project water eupply at points 'of diversion <br />, Industrial, municipal, and domestic use <br />Irrigation . . . . . '1' . . '. ',' <br />Total . . . . . . . . . . . . <br />Depletion of Colorado River . . . . . <br />.,', I, <br /> <br />IRRIGATION SERVICE AREA (acres) <br />, <br />I <br />Full service land (now cu1tivsted) <br />Supplemental aervice land' . . <br />To tal . . . . . . . f. '. <br />, <br /> <br />71,500 <br />2l~0 <br />92,700 <br />7",900 <br /> <br />7,900 <br />J,ll..Q. <br />11,040 <br />